首页> 外文会议>Annual technical conference of the North American Society for Trenchless Technology >PARRIS ISLAND FORCE MAIN PROJECT CREATES RECORD HDD INSTALLATION FOR PLASTIC PIPE
【24h】

PARRIS ISLAND FORCE MAIN PROJECT CREATES RECORD HDD INSTALLATION FOR PLASTIC PIPE

机译:PARRIS ISLAND FORCE的主要项目创建了用于塑料管的记录硬盘安装

获取原文

摘要

In September 2008, the Beaufort-Jasper Water and Sewer Authority (BJWSA) assumed ownership, operation, and maintenance responsibility for the water and wastewater systems at several local military facilities, including the Marine Corps Recruit Depot at Parris Island, SC. Due to the restrictive Beaufort River discharge requirements, the military wastewater plants at the Air Station and Parris Island needed to be eliminated and flows diverted to BJWSA's state-of-the-art Port Royal Island, SC Water Reclamation Facility. This operational change required the waste stream at Parris Island to be piped off of the island. But with extensive tidal marshland, and other traditional construction constraints present, the new sewer force main from Parris Island had to be installed under Archer's Creek and the surrounding marsh via Horizontal Directional Drilling (HDD) methodology. Open cutting across the salt marsh would have been very difficult, even had it been possible to permit. BJWSA's growing body of experience with long HDD installations and recent advances with the technology made drilling the only viable option. The Mears Group mobilized in October, 2009 and began the pilot bore. On December 2,2009,6,400 linear feet of fused 16" DR 18 FPVC® pipe was positioned on rollers and pulled into place to complete the crossing. This paper will discuss all aspects of this 6,400 LF record breaking crossing, including the bore completion, staging and inserting that length of pipe, and working within the requirements of the military base, which made this project even more challenging.
机译:2008年9月,博福特-贾斯珀水务和污水处理局(BJWSA)承担了几家当地军事设施(包括位于南卡罗来纳州帕里斯岛的海军陆战队新兵基地)的自来水和废水系统的所有权,运营和维护责任。由于限制了Beaufort河的排放要求,因此需要消除空军站和Parris岛上的军事废水处理厂,并将废水转移到BJWSA最先进的SC水资源回收设施皇家岛上。这种操作上的变化要求将帕里斯岛的废物流从岛上引出。但是,由于潮汐沼泽泛滥,并且存在其他传统的施工限制,因此必须通过水平定向钻井(HDD)方法将来自帕里斯岛的新下水道总管安装在Archer's Creek和周围的沼泽下。即使有可能允许,在盐沼上进行开挖也是非常困难的。 BJWSA在安装长硬盘驱动器方面的经验与日俱增,并且该技术的最新发展使钻探成为唯一可行的选择。米尔斯小组于2009年10月动员起来,开始进行试射。 2009年12月2日,将6,400线性英尺的熔融16“ DR 18FPVC®管放置在滚轴上并拉入到位以完成穿越。本文将讨论此6,400 LF破纪录穿越的所有方面,包括钻孔完工,分段并插入一定长度的管道,并在军事基地的要求内工作,这使该项目更具挑战性。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号