Assessment of Hydrodynamic Impacts Throughout the Bay of Fundy and Gulf of Maine Due to Tidal Energy Extraction by Tidal Lagoons

机译:潮汐泻湖提取潮汐能对整个芬迪湾和缅因州湾的水动力影响的评估

获取原文

摘要

The Bay of Fundy is home to some of the world's largest tides and has long been identified as one of the world's premier locations for the installation of tidal power generating systems. This paper deals with the assessment of hydrodynamic impacts throughout the Bay of Fundy and Gulf of Maine due to power generation by tidal lagoons located in Minas Basin. The lagoon concept involves temporarily storing seawater behind an impoundment dike and generating power by gradually releasing the seawater through conventional low-head hydroelectric turbines. Tidal lagoons represent a relatively novel approach to tidal power generation, and are intended to achieve high efficiency while avoiding some of the environmental problems associated with tidal barrages. A detailed two-dimensional (depth-averaged) finite-element numerical model, based on the TELEMAC system, has been developed, calibrated against observed water levels and velocities, and applied to simulate tidal hydrodynamics throughout the Bay of Fundy and Gulf of Maine, both for existing conditions without a lagoon and for two scenarios with tidal lagoons operating in Minas Basin. A 12 km2 offshore lagoon with 14 turbines generating -124 MW on average and a 24 km2 coastal lagoon with 24 turbines generating -220 MW on average have been investigated. This paper provides a summary of the work that has been performed to date and presents results describing the local and far-field changes in water levels and tidal currents due to tidal lagoons operating in the upper Bay of Fundy.
机译:芬迪湾是世界上一些最大的潮汐之乡,长期以来一直被认为是安装潮汐发电系统的全球主要地点之一。本文研究了位于米纳斯盆地的潮汐泻湖发电对整个芬迪湾和缅因州湾的水动力影响。泻湖概念涉及将海水临时存储在堤坝后,并通过传统的低水头水力涡轮机逐渐释放海水来发电。潮汐泻湖代表了一种相对新颖的潮汐发电方法,旨在实现高效率,同时避免一些与潮汐拦河坝相关的环境问题。已开发出基于TELEMAC系统的详细二维(深度平均)有限元数值模型,并根据观测到的水位和速度进行了校准,并用于模拟整个芬迪湾和缅因州湾的潮汐水动力,在没有泻湖的现有条件下,以及在米纳斯盆地运行的有潮汐泻湖的两种情况下。我们研究了一个12平方公里的海上泻湖,其中14台涡轮机平均产生-124兆瓦,而24平方公里的沿海泻湖中的24台涡轮机平均产生-220兆瓦。本文提供了迄今为止已完成工作的摘要,并提供了描述由于在芬迪湾上游作业的泻湖而引起的局部和远场水位和潮汐变化的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号