首页> 外文会议>2011 International Conference on Consumer Electronics, Communications and Networks >Research and development of 4D construction management system for Zhenru Shanghai West Railway Station
【24h】

Research and development of 4D construction management system for Zhenru Shanghai West Railway Station

机译:上海振如西站4D施工管理系统的研究与开发

获取原文

摘要

In order to enhance Zhenru Shanghai West Railway Station project management level and efficiency, Tongji University, cooperation with the inventors, developed 4D construction management system for Shanghai West Railway Station by establishing the Shanghai West Railway Station 4D information model and its information integration mechanism. The system implemented the construction visual simulation and 4D dynamic managements of construction progress, labors, materials, machinery by the mutual links of engineering model, construction schedule and resources. The experimental results show that 4D technology is supported to raise information management and improve the efficiency of the Zhenru Shanghai West Railway Station project. The research presents a new information management method for railway station construction, and has a high practical value and broad prospects.
机译:为了提升仁鲁上海西火车站项目管理水平与效率,同济大学,与发明人的合作,通过建立上海西火车站4D信息模型及其信息集成机制,开发了上海西火车站的4D施工管理系统。该系统实施了施工进度,劳动力,材料,机械的施工视觉仿真和4D动态管理,通过工程模型的相互联系,施工时间表和资源。实验结果表明,4D技术得到支持,提高信息管理,提高仁鲁上海西部火车站项目的效率。该研究提出了一种新的火车站建设信息管理方法,具有很高的实用价值和广阔的前景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号