首页> 外文会议>Power plant air pollutant control mega symposium >Full Scale Demonstration of a Plant Wide MultiPollutant Control Project 18 Months in Operation
【24h】

Full Scale Demonstration of a Plant Wide MultiPollutant Control Project 18 Months in Operation

机译:运营18个月的工厂范围内的多污染物控制项目的全面演示

获取原文

摘要

The Arizona Public Service Cholla Station is the site of a full-scale multi-pollutant control project with numerous unique features. The goals of the project were to simultaneously implement modifications to reduce emissions of particulate and SO2 while providing improved inherent mercury control and capability for further mercury reductions. This paper will provide an update on the performance of Unit 4 completed in May of 2008 and the progress and performance data of Unit 3, including the conversion of a hot-side electrostatic precipitator to a fabric filter, installation of a wet lime FGD system utilizing inhibited oxidation, significant upgrades to the existing lime reagent preparation and waste slurry disposal systems and conversion of the existing stack to accommodate operation in the "wet stack" mode. Specific plant operation and performance data for each unit will be incorporated and discussed.
机译:亚利桑那州公共服务Cholla站是具有多种独特功能的全面多污染物控制项目的所在地。该项目的目标是同时进行修改,以减少颗粒物和SO2的排放,同时提供改进的固有汞控制和进一步减少汞的能力。本文将提供有关2008年5月完成的第4号机组性能的最新信息以及第3号机组的进度和性能数据,包括将热侧静电除尘器转换为织物过滤器,使用湿法石灰烟气脱硫系统安装抑制氧化,对现有石灰试剂制备和废浆处理系统进行重大升级,并对现有烟囱进行改造,以适应“湿烟囱”模式下的操作。每个单元的具体工厂运行和性能数据将被合并和讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号