Performance of the Boswell Energy Center Unit 3 Environmental Improvement Project

机译:博斯韦尔能源中心第3单元环境改善项目的绩效

获取原文

摘要

Minnesota Power's Boswell Energy Center Unit 3 is the site of a recently-completed, full-scale, multi-pollutant control project in northeastern Minnesota. The goal of the project was to simultaneously implement air pollution controls to reduce emissions of sulfur dioxide (SO2), nitrogen oxides (NO_X), and mercury from the 355-MW unit. This paper will describe the design and performance of the project, which includes the installation of a new Selective Catalytic Reduction (SCR) system, low NO_X burners, overfire air, fabric filter baghouse, activated carbon injection, wet limestone Flue Gas Desulfurization (FGD) system, and induced draft (ID) fans. The installation of the new ash handling system and limestone handling system will also be discussed. Performance tests were performed in January and February 2010. The results of this testing will be discussed.
机译:明尼苏达州电力公司的Boswell能源中心3号机组是明尼苏达州东北部最近完成的一项全面,多污染物控制项目的所在地。该项目的目标是同时实施空气污染控制措施,以减少355兆瓦机组的二氧化硫(SO2),氮氧化物(NO_X)和汞的排放。本文将介绍该项目的设计和性能,其中包括安装新的选择性催化还原(SCR)系统,低NO_X燃烧器,过度燃烧空气,织物过滤器集尘室,活性炭注入,湿石灰石烟道气脱硫(FGD)系统和引风机(ID)风扇。还将讨论新的灰渣处理系统和石灰石处理系统的安装。在2010年1月和2010年2月进行了性能测试。将讨论该测试的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号