Innovative Design Solutions Speed Construction of Commuter Rail Corridor

机译:创新设计解决方案加快通勤铁路走廊的建设

获取原文

摘要

This paper will detail the design challenges and construction of the extension of the New Mexico Rail Runner commuter rail corridor from Bernalillo, NM to Santa Fe, NM. Numerous innovative solutions were implemented in the design and construction of the project to meet the aggressive schedule dictated by the client. The project was awarded to the design-build contractor in August 2007 and the line was opened to traffic in December 2008. This project was an important component of the New Mexico statewide transportation improvement project.Project final design and construction plans for the 18 mile extension were completed in five months. Construction started prior to completion of the final construction documents. The design was planned to provide a steady flow of Approved for Construction (AFC) documents to facilitate construction.Project highlights included eighteen miles of welded rail on concrete ties, six railroad bridges, one highway bridge overpass, two rail passing sidings, six concrete box rail crossings and 18 miles of new 1361b welded rail on concrete ties.The project is designed to meet the operating requirements of Class IV track and an operating speed of 79 mph.The major civil quantities included two million cubic yards of earthwork, 59,000 square feet of MSE retaining walls, 263,000 tons of ballast and subballast, 98,000 track feet of rail, and 50,000 concrete ties.The project team (NMDOT and Design-Build Consortium) collaborated by meeting weekly and reviewing plans and solutions, prior to acceptance for construction. Key to this effort was the use of the 3D design model created for the entire project leading to refining of the project quantities, reducing cost and allowing the NMDOT to remain within the budget established for this project.
机译:本文将详细介绍从新墨西哥州贝纳里洛至新墨西哥州圣达菲的新墨西哥铁路转轮通勤铁路走廊的设计挑战和扩建工程。在项目的设计和施工中实施了许多创新解决方案,以满足客户要求的积极进度。该项目于2007年8月授予设计建造承包商,该生产线于2008年12月通车。该项目是新墨西哥州全州交通改善项目的重要组成部分。 18英里延伸段的项目最终设计和施工计划在5个月内完成。在完成最终施工文件之前就开始施工。设计该计划是为了提供稳定的施工批准(AFC)文件流,以便利施工。 项目亮点包括18英里的混凝土连接线上的焊接轨道,6座铁路桥,1座公路桥立交桥,2根铁路通过壁板,6根混凝土箱形铁路交叉口和18英里的混凝土连接线上的新型1361b焊接轨道。 该项目旨在满足IV级履带的运行要求以及79 mph的运行速度。 主要的民用建筑数量包括200万立方码的土方工程,59,000平方英尺的MSE挡土墙,26.3万吨的压载物和次压载物,98,000英尺的铁路轨道和50,000根混凝土扎带。 项目团队(NMDOT和设计建造联盟)通过在开会验收之前每周开会并审查计划和解决方案进行协作。这项工作的关键是使用为整个项目创建的3D设计模型,从而精炼项目数量,降低成本并使NMDOT保持在为该项目制定的预算之内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号