首页> 外文会议>PVP2010;ASME Pressure Vessels and Piping Division/K-PVP conference >SEISMIC SAFETY MARGIN ASSESSMENT FOR ELECTRICAL COMPONENTS UTILIZING FULL-SCALE TEST
【24h】

SEISMIC SAFETY MARGIN ASSESSMENT FOR ELECTRICAL COMPONENTS UTILIZING FULL-SCALE TEST

机译:利用大规模试验对电气部件进行地震安全保证金评估

获取原文

摘要

In Japan, the Regulatory Guide for Reviewing Seismic Design of Nuclear Power Reactor Facilities (2006) requires that residual risk for earthquakes beyond design base be considered. Moreover, in the Niigata-ken Chuetsu-oki earthquake (NCOE:2007), the earthquake motion exceeded the seismic design condition of the Kashiwazaki-Kariwa nuclear power plants (K-K NPPs). In response to these issues, there is a growing demand for quantitative clarification of seismic safety margin.
机译:在日本,审查核电反应堆设施地震设计的监管指南(2006年)要求考虑地震的剩余风险。此外,在Niigata-Ken Chuetsu-OKI地震(NCoE:2007)中,地震运动超出了Kashiwazaki-Kariwa核电站的地震设计状况(K-K NPPS)。为应对这些问题,对地震安全保证金的定量澄清存在日益增长的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号