Blood From a Stone: Lessons Learned Removing an Unsafe Dam

机译:一块石头的血:经验教训取消了一个不安全的水坝

获取原文

摘要

Faced with a failing dam and regulatory pressure to take action, the dam owner made their position clear - full cooperation with any removal scheme, but they could not "get blood from a stone". The family that has owned property for multiple generations did not have the financial means to remove the hazard. The Martin Farm Dam was constructed in 1965 to provide for aquaculture and as a recreational asset for a young family. Unfortunately, decades of neglect meant that by April 2016 the structure was in imminent danger of failure. Faced with a plugged riser, partially collapsed spillway pipe and rising water levels, the dam owner contacted the Maryland Department of the Environment (MDE) Dam Safety Division, which was previously unaware of the dam. Inspections revealed a heavily wooded embankment and a slowly progressing internal erosion failure that had removed a significant portion of the downstream embankment. DSS-WISE Lite was used to assess potential downstream impacts, resulting in a significant hazard classification. Recognizing that the situation was not within their means to address, in 2017 the owner engaged GreenTrust Alliance (GTA), a green infrastructure non-profit, as an adviser Concurrently, the MDE Dam Safety Division performed frequent inspections, investigated possible funding sources, and met with senior state and local officials, emergency managers and other parties to convey the urgency of the matter. The record-setting rains of 2018 prompted the Dam Safety Division to construct an emergency siphon to lower rising water levels. This action convinced key decision makers that dam failure was a real possibility By emphasizing both the public safety hazard and the ecological benefits of restored wetlands and streams in an environmentally sensitive watershed, GTA was able to obtain grant funding to remove the dam, which was completed in January 2019. This presentation explores lessons learned from this project, touching on need for a project "champion", the tools used to inform decision makers, the regulatory flexibility and predictability needed to fast-track construction, and the adaptability of the project partners to deliver the project while meeting regulatory goals and avoiding impacts to sensitive wild brook trout populations downstream.
机译:与一个失败的水坝和监管压力采取行动面前,大坝业主作出自己的立场 - 与任何消除方案充分合作,但他们无法“从石头里的血”。已经拥有的财产多代家庭没有足够的财力来去除危险。马丁坝农场于1965年建造,提供水产养殖和作为一个年轻的家庭休闲娱乐的资产。不幸的是,几十年的忽视意味着到2016年4月的结构是失败的迫在眉睫的危险。与立管堵塞,部分坍塌泄洪管和水位上涨面前,大坝业主接触的环境(MDE)大坝安全部门,这是以前不知道大坝的马里兰部门。检查揭示了大量树木繁茂堤和已消除下游堤的显著部分的缓慢进展的内部侵蚀故障。 DSS-WISE精简版来评估潜在的下游影响,导致显著危害分类。认识到这种情况并没有他们的手段地址中,在2017年的所有者从事GreenTrust联盟(GTA),绿色基础设施的非营利性,以顾问的同时,MDE大坝安全部门进行频繁的检查,调查可能的资金来源,并会见资深州和地方官员,应急管理人员和其他有关各方传达了事情的紧迫性。 2018年创纪录的降雨促使大坝安全部门构建应急虹吸降低水位上涨。这个动作说服关键的决策者溃坝是一个真正的可能性通过强调公众安全危害和对环境敏感的分水岭恢复湿地和溪流的生态效益两者GTA能够获得补助资金,除去水坝,这已完成一月2019本演讲将探讨教训从这个项目了解到,触及需要一个项目“冠军”,这些工具用于告知决策者,监管的灵活性和需要快速通道建设预见性和项目合作伙伴的适应性同时满足监管目标,并避免影响到下游的敏感野生溪鳟鱼种群交付项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号