CUTOFF WALL CONSTRUCTION BY THE SELF-HARDENING SLURRY METHOD AT THE HERBERT HOOVER DIKE, FL ASDSO, September 2010 - Seattle, Washington

机译:截止墙施工在赫伯特霍佛堤防,FL Asdso,2010年9月 - 西雅图,华盛顿

获取原文

摘要

The 140 mile long Herbert Hoover Dike (HHD) around Lake Okeechobee, FL, does not meet current dam safety criteria. The earthen embankment of the dike is subject to potential failure because of internal erosion, piping and slope instability at high water levels. Should the dike fail, there could be catastrophic effects on the entire southern Florida region. In 2007, the US Army Corp of Engineers (USACE) placed the HHD on the Top 6 list of dams in the nation needing repair and has prioritized and budgeted more funding for HHD than any other dam safety construction project in the nation. In August 2007, TREVIICOS South (TIS) was one of three specialty contractors awarded an Indefinite Delivery Indefinite Quantity Contract for the construction of the cutoff wall through the dike and its foundation in the most vulnerable section specified as Reach 1, which extends from Belle Glade to Port Mayaca, FL, for a total of about 22 miles. In June 2008, the USACE awarded TIS a Multiple Task Order Contract, Task Order No. 3, which included the installation of a 500 ft long cutoff wall test section and options to construct an additional 16,200 ft long cutoff wall. TIS selected the self-hardening slurry method for the cutoff wall. The excavation is performed through the soil with mechanical and hydraulic clamshells, and in the limestone rock with a hydromill cutter, to a depth of up to 80 ft from the top of the dike. During excavation, the slurry maintains the trench stability. At the completion of the excavation, the slurry hardens and becomes the wall backfill material. Within 28 days from the installation, the cutoff wall is cored approximately every 200 ft and tested for acceptance. Testing includes the measurement of unconfined compressive strength, as well as triaxial and in-situ permeability.
机译:在Okeechobee湖畔沃尔湖(Hhd),FL湖周围的140英里长的Herbert Hoover Dike不符合当前的大坝安全标准。由于内部侵蚀,管道和坡度在高水位下,堤防的土地堤受潜在的失败。如果堤防失败,佛罗里达州的整个南部地区都可能存在灾难性的影响。 2007年,美国陆军工程师(USACE)将HHD放在了最需要维修的国家前6名大坝名单上,并优先考虑HHD的更多资金,而不是国家的任何其他大坝安全建设项目。 2007年8月,Treviicos South(TIS)是三家专业承包商之一,授予无限期的交付无限数量合约,用于建造截止墙体通过堤防及其基础,在最脆弱的部分中指定为达到的群体,它从百叶林林延伸到佛罗里达州口岸,总共约22英里。 2008年6月,USACE授予TIS多个任务订单合同,任务订单3号,其中包括安装500英尺长的截止墙测试部分和选项,以构建额外的16,200英尺长的截止墙。 Tis选择了截止墙的自硬化浆料方法。挖掘通过用机械和液压蛤壳,在石灰石岩石中通过土壤进行,从液体刀具,距离堤防顶部高达80英尺的深度。在挖掘过程中,浆料保持沟槽稳定性。在挖掘完成时,浆料硬化并成为壁回填材料。在安装后28天内,截止墙大约每200英尺核心并进行验收。测试包括测量无束缚的抗压强度,以及三轴和原位渗透率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号