首页> 外文会议>Association of State Dam Safety Officials annual conference >Investigation of Tree Root Penetration into a Levee Soil-Cement-Bentonite Slurry Cutoff Wall
【24h】

Investigation of Tree Root Penetration into a Levee Soil-Cement-Bentonite Slurry Cutoff Wall

机译:堤防渗入土壤-水泥-膨润土泥浆防渗墙的研究

获取原文

摘要

Regulatory policies have been recently promulgated calling for the removal of all woody vegetation and trees that have grown and matured on or near levees. Due to the significant financial and environmental impacts of removing this mature vegetation, many levee owners and maintaining agencies are looking to retain at least some woody vegetation and are interested in exploring whether structural components such as steel sheetpiles or slurry cutoff walls installed through the top of the levee could act as effective root barriers. To investigate the feasibility of using a soil-cement-bentonite (SCB) wall as a potential root barrier, an 18-year-old SCB wall installed in a Sacramento River levee in Sacramento's Pocket Area was partially excavated in October 2009. Trench excavations were completed opposite a large black walnut tree growing at the landside edge of the levee crown. The purpose of the trenching was to determine if roots from this tree had penetrated into or through the 18-inch-wide SCB wall during the 18 years following wall construction. Trenching excavations revealed that roots up to 13/s inches in diameter had been encountered during the original construction of the wall and had apparently been cut or broken at the edge of the wall by construction equipment. However, over time, many of the broken ends of the roots had regenerated new branch roots. These new root extensions were found to have penetrated into the SCB wall a few inches, and then to have divided into smaller branches that travelled laterally within the outer few inches of the wall, perhaps absorbing moisture from the wall which still retained a high water content. Some root branches were found to have travelled more than 10 feet laterally within the outer few inches of the wall. The SCB wall was also found to have numerous, small vertical cracks that were regularly spaced about 10 to 20 inches apart, presumably caused by shrinkage of the wall over time. Where the roots encountered the cracks, small branch roots sometimes exploited the cracks and travelled through the wall. An important finding was that the tree roots were not observed to penetrate the wall except through the small cracks. This paper presents some of the observations made during the trenching investigations, laboratory test results for samples from the levee fill and the SCB wall, and information on root characteristics encountered.of the intended purpose of the SCB wall. Future investigations examining whether such cracks occur in more modern SCB walls, and if so, to what depths, would be extremely valuable.
机译:最近颁布的监管政策呼吁删除所有在levees或靠近或附近成熟的木本植物和树木。由于删除了这种成熟植被的重要财务和环境影响,许多堤坝所有者和维护机构都希望保留至少一些木质植被,并且有兴趣探索穿过顶部安装的钢铁型或浆料截止墙体等结构部件堤坝可以充当有效的根障碍。探讨使用土壤 - 水泥 - 膨润土(SCB)墙作为潜在的根屏障的可行性,安装在萨克拉门托口袋区的萨克拉门托河堤中的18岁的SCB墙在2009年10月部分挖掘。壕沟挖掘是完成了在堤坝旁边生长的大型黑核桃树相对。挖沟的目的是确定来自这棵树的根部是否穿透到墙面构造后18年内或通过18英寸宽的SCB墙壁。挖沟挖掘显示,在墙上的原始结构期间遇到了直径直径13 / S英寸的根,并且通过施工设备显然在墙壁的边缘切割或破碎。然而,随着时间的推移,根部的许多破碎的末端已经再生新的分支根。发现这些新的根延伸将渗透到SCB壁中几英寸,然后分为横向在壁的外部几英寸内横向行驶的较小分支,或许吸收仍然保留高含水量的墙壁。发现一些根部分支在墙上的外部几英寸内横向行驶超过10英尺。也发现SCB壁具有许多小的垂直裂缝,该垂直裂缝通常间隔约10至20英寸,可能是由于墙的收缩而导致的。在根源遇到裂缝的情况下,小分支根有时会利用裂缝并穿过墙壁。重要的发现是,除了通过小裂缝之外,没有观察到树根渗透墙壁。本文介绍了在挖沟调查期间进行的一些观察结果,从堤坝填充和SCB壁的样品的实验室测试结果以及有关SCB墙壁预期目的的根本特征的信息。未来的调查检查这些裂缝是否发生在更现代的SCB墙壁中,如果是的话,深度将是非常有价值的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号