Three important projects of application of the seismic isolation to existing buildings are described in the paper.The first project is located in Naples and consisted in a reinforced concrete structure of 125×170×20 meter, belonging to the Municipality of Naples. The construction started in year 1976 and was stopped in year 1979 when all the foundations and the reinforced concrete frame was completed. In year 1999 the Municipality decided to complete the building but in the meantime the Italian Seismic Standard was changed and the already built structure was no more adequate for the newly defined seismic action implying a PGA of 0,25g. Seismic isolation was found to be the best and more economical solution to provide the building with the necessary resistance, minimizing at the same time the necessary strengthening to the existing structure and foundation. The seismic isolation has been provided through the application of 636 High Damping Rubber Bearings with equivalent viscous damping of 10%. The use of HDRB allowed to shift the period of the structure from 0,7 to 1,75 s and reducing the acceleration from 0,42 to 0,14g. To cut the columns ALGA developed special steel clamps, applied over and under the location of the cuts by use of prestressed bars in order to generate a friction suitable to support the load transferred by the concrete column. After the application of the clamps the vertical load of the column was released by use of hydraulic jacks, the column cut, the isolator installed and the clamps removed.The second application has been made to the airport structure of Antalya, Turkey. The job consisted in cutting the reinforced concrete columns and applying 358 LRB. During the cutting phase the vertical loads were transferred to an auxiliary steel structure applied below the beams by use of hydraulic jacks. The base isolation allowed to shift the period to 2,69 s, reducing the acceleration to 0,lg, being the design PGA 0,4g. Peculiar aspect was the fact that the retrofitting has been performed without interfering with the airport activity.The last project described, currently in progress, is the Justice Palace of Avellino, near Naples. For this project the use of sliding pendulum isolators has been foreseen as this was the only possible solution allowing to shift the period to 3,5 s and therefore reduce the acceleration below 0,07 g. In this way was possible to retrofit the structure avoiding any additional reinforcement to the upper structure. To reduce the dimensions of the isolators and to reduce the eccentricity caused by the design displacement, sliding pendulum with 2 spherical surface has been foreseen. The total number of sliding pendulum isolators is 220.
机译:本文描述了将地震隔离应用于现有建筑物的三个重要项目。 第一个项目位于那不勒斯,由那不勒斯市的125×170×20米的钢筋混凝土结构组成。该建筑始于1976年,并于1979年停止,当时所有基础和钢筋混凝土框架均已竣工。在1999年,市政府决定完成建筑,但与此同时,意大利地震标准也发生了变化,已经建成的结构对于新定义的地震作用已经不再足够,意味着PGA为0.25g。人们发现,隔震是最好的,更经济的解决方案,可为建筑物提供必要的抵抗力,同时最大程度地减少对现有结构和基础的必要加固。通过使用636高阻尼橡胶轴承提供了地震隔离,等效粘性阻尼为10%。使用HDRB可以将结构的周期从0.7 s改变为1.75 s,并将加速度从0.42降低到0.14 g。为了切割柱子,ALGA开发了特殊的钢夹,通过使用预应力棒将其施加在切割点的上方和下方,以产生适合支撑混凝土柱传递的载荷的摩擦力。施加夹具后,通过使用液压千斤顶释放色谱柱的垂直载荷,切开色谱柱,安装隔离器,然后卸下夹具。 第二个申请已提交给土耳其安塔利亚的机场结构。这项工作包括切割钢筋混凝土柱并应用358 LRB。在切割阶段,通过使用液压千斤顶将垂直载荷转移到施加在横梁下方的辅助钢结构中。基本隔离允许将周期更改为2,69 s,从而将加速度降低至0,lg,即设计PGA 0.4 g。特殊的方面是在不干扰机场活动的情况下进行了改装。 描述中的最后一个项目正在进行中,是那不勒斯附近的阿韦利诺司法宫。对于此项目,已预见到将使用滑动摆式隔离器,因为这是将周期更改为3.5 s并因此将加速度降低到0.07 g以下的唯一可能的解决方案。这样,可以对结构进行翻新,避免对上部结构进行任何额外的加固。为了减小隔离器的尺寸并减小由设计位移引起的偏心,已经预见到具有两个球形表面的滑动摆。滑动摆式隔离器的总数为220。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号