首页> 外文会议>World energy conference;WEC Montreal 2010 >500 MILLION PEOPLE WITH NO ACCESS TO POWER HOW INDIA CAN TACKLE ITS SEVERE POWER SHORTAGE DURING THE NEXT DECADES?
【24h】

500 MILLION PEOPLE WITH NO ACCESS TO POWER HOW INDIA CAN TACKLE ITS SEVERE POWER SHORTAGE DURING THE NEXT DECADES?

机译:5亿人无电可查印度在接下来的十年中如何解决严重的电力短缺?

获取原文

摘要

India's population, now around 1.1 billion, is growing fast, and is expected to surpass that of China soon after 2020 - making it the largest in the world. Its economy is also expanding, growing at around 10 percent annually from 2000 to 2008, and despite a current dip due to the global crisis, the pace is expected to be over 9 percent for most of the next decade.All of this bodes well for the electricity sector; consumption, currently at some 600TWh annually, is set to double by 2020 - by when it will have surpassed Russian levels. To supply this extra electricity, total generating capacity should jump by 90 GW, to 241GW, with an increased emphasis on nuclear, clean coal and renewables, including solar and small-hydro.
机译:印度的人口目前约为11亿,正在快速增长,并有望在2020年后很快超过中国,使其成为世界上最大的人口。它的经济也在增长,从2000年到2008年,每年以大约10%的速度增长,尽管当前由于全球危机而出现下滑,但在未来十年的大部分时间里,这一速度有望超过9%。 所有这些对电力部门来说都是好兆头。目前的年消费量约为600TWh,到2020年将超过俄罗斯的水平,届时将增加一倍。为了提供额外的电力,总发电量应跃升90吉瓦,达到241吉瓦,同时将重点放在核能,清洁煤和可再生能源(包括太阳能和小水电)上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号