首页> 外文会议>Offshore technology conference;OTC 10 >Perdido Development: World's First Ultra-deepwater Drilling Production Facility
【24h】

Perdido Development: World's First Ultra-deepwater Drilling Production Facility

机译:Perdido开发:世界上第一个超深水钻井和生产设施

获取原文

摘要

The Perdido Development Project is an ultra-deep water development of the Great White, Silver Tip and Tobago fields in the remote southwestern Gulf of Mexico (Figure 1). Perdido will be the first to produce from the Lower Tertiary (Paleogene) geologic setting in the Gulf. Moored in 7817 feet (2,382m) of water in Alaminos Canyon Block 857, the spar host will be the world's deepest drilling and production facility. In 9627 feet (2,934m) of water, the Tobago subsea oil well will be the deepest producing well in the world. This paper will provide an overview of the Perdido project, discussing the challenges that had to be overcome and the innovations that had to be developed to successfully deliver the project.Perdido Development facilities (Figure 2) consist of:1. Truss spar with light weight, "single-lift" topsides2. Six-slot, wet-tree, direct vertical access (DVA) well system with a full capability drilling rig3. 34 subsea wells including the 22 DVA wells under the spar4. All production commingled on the seafloor, gas separated from liquids and liquids pumped from the seafloor up to the spar host5. Throughput: oil 100 mbopd, gas 200 mmscfd, water 40 mbwpd, water injection 80 mbwpd6. Oil and gas export pipelinesThe significant challenges to delivering Perdido fell into the categories of safety, the need for new technology and low cost solutions, and overcoming overheated market conditions. With all of the many difficulties to be overcome, the team committed itself early in the project to intensely focus on safety as the highest priority. The result has been both outstanding project execution safety performance across many locations and in the raising of the bar of how safety is incorporated into platform designs. As to the technical and cost challenges, Perdido's difficult reservoirs, high well count and ultra-deep water made the development uneconomic with conventional deepwater technologies. To produce the wells, reduce the size of the host and reduce the cost of development, an innovative system of new technologies was required, consisting primarily of wet-tree, direct vertical access (DVA) wells with a Subsea Boosting System. Sanctioning and executing the project during one of the industry's most overheated markets created numerous cost, quality, resourcing and delivery problems, requiring extraordinary effort from the project team and contractors to keep the project on track.
机译:Perdido开发项目是位于墨西哥西南部偏远海湾的大白,银尖和多巴哥油田的超深水开发项目(图1)。 Perdido将是第一个在海湾的下第三纪(古近纪)地质环境中生产的产品。晶石船停泊在阿拉米诺斯峡谷857号区块的7817英尺(2,382m)水深处,将成为世界上最深的钻探和生产设施。多巴哥海底油井将在9627英尺(2,934m)的水深中成为世界上最深的采油井。本文将概述Perdido项目,讨论必须克服的挑战以及为成功交付该项目而必须进行的创新。 Perdido开发设施(图2)包括: 1.轻型桁架梁,“单举”顶侧 2.具有全功能钻机的六槽湿树直接垂直通道(DVA)井系统 3. 34口海底井,包括在梁下的22口DVA井 4.所有产品混合在海底,从液体中分离出的气体以及从海底泵送到晶石宿主的液体 5.吞吐量:石油100 mbopd,气体200 mmscfd,水40 mbwpd,注水80 mbwpd 6.石油和天然气出口管道 交付Perdido的重大挑战包括安全性,对新技术和低成本解决方案的需求以及克服过热的市场条件。在克服所有困难的同时,该团队在项目初期就承诺将安全作为第一要务。其结果是不仅在许多地方都具有出色的项目执行安全性能,而且提高了将安全性纳入平台设计的门槛。对于技术和成本方面的挑战,Perdido的水库难度大,井数高和超深水使传统的深水技术开发变得不经济。为了生产油井,减小主体尺寸并降低开发成本,需要一种创新的新技术系统,该系统主要包括带有水下增压系统的湿式树状直接垂直通道(DVA)油井。在行业最过热的市场之一中批准和执行项目会造成大量成本,质量,资源和交付问题,需要项目团队和承包商付出巨大的努力才能使项目步入正轨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文