首页> 外文会议>National Conference on Electrical, Electronics and Computer Engineering >A software that developed to perform short-term planning studies, prepare capital expenditures (CAPEX) and analyse planning performance of electric power distribution systems
【24h】

A software that developed to perform short-term planning studies, prepare capital expenditures (CAPEX) and analyse planning performance of electric power distribution systems

机译:开发用于执行短期计划研究,准备资本支出(CAPEX)并分析配电系统的计划性能的软件

获取原文

摘要

Privatization in the electricity sector has been accelerated recently, and many distribution companies owned by TEDAS has already been privatized in 2010. These companies are now subject to regulation by EPDK and therefore their capital expenditures should be approved by EPDK in order to be compensated by electricty tariffs. Therefore, contrary to traditional practice, distribution system planning should be managed by distribution companies and controlled by regulatory more carefully and professionally anymore. This paper presents a initial version of a software tool which enables distribution planning and analysis, and thereby how to ease the planning process. The paper also suggests some methodological analysis to assess and benchmark different CAPEX proposals.
机译:电力行业的私有化最近已经加速,TEDAS旗下的许多配电公司已经在2010年实现私有化。这些公司现在受到EPDK的监管,因此其资本支出应获得EPDK的批准才能用电补偿。关税。因此,与传统做法相反,配电系统规划应由配电公司管理,并应由监管机构更仔细,更专业地控制。本文介绍了软件工具的初始版本,该软件工具可以进行配电计划和分析,从而可以简化计划过程。本文还提出了一些方法学分析,以评估和基准化不同的CAPEX建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号