How to put down power quality issues before they put you down — Dealing with wind turbine issues

机译:如何在他们让您拖欠风力涡轮机问题之前放下电力质量问题

获取原文

摘要

Today's wind farms are getting very large. While there were and still are the university wind farms with one, two or three turbines serving an educational role, the practical wind farms consist of 100 wind turbines rated 2000 KW each. Two hundred megawatts is a generous non-utility generation source. These generation sources are typically connected to a transmission line that happens to pass near the location. A connection to a 230 KV or 345 KV transmission line may create a three-ended line, which has special system protection requirements. Waveform distortion or harmonic voltages appear on transmission systems, but the lines typically terminate on transformers, so the distortion is contained and causes no problems. Industrial customers with distorting loads are connected to transmission systems to allay flicker and harmonic concerns, as there are no serious resonance concerns on the transmission system or those are simple and easily counteracted. With a wind farm with 100 generators, each with multiple power factor correction stages and connected with miles of underground cable, the resonance concerns become very important. Transformers and capacitor banks fail soon after installation, sometimes dramatically.
机译:今天的风电场变得非常大。虽然大学风电场有一个,两种或三个涡轮机服务于教育角色,但实际的风电场由100个风力发电机组成,每个风力涡轮机由2000千瓦级。二百兆瓦是一款慷慨的非公用工业一代来源。这些生成源通常连接到发生在该位置附近的传输线。连接到230 kV或345 kV传输线可以创建一个三端,具有特殊的系统保护要求。波形失真或谐波电压出现在传输系统上,但线通常在变压器上终止,因此含有失真并导致没有问题。具有扭曲负荷的工业客户与传输系统相连,以消除闪烁和谐波担忧,因为传输系统没有严重的共振问题,或者简单且容易抵消。带有100个发电机的风电场,每个带有多个功率因数校正阶段,与地下电缆数英里,共振问题变得非常重要。在安装后,变压器和电容器银行发生故障,有时会显着。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号