【24h】

Shihmen sediment prevention diversion tunnel planning and design

机译:石门防沙引水隧洞规划设计

获取原文

摘要

Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.
机译:石门水库始建于1963年5月。石门水库的主要用途是农业,电力供应,防洪和旅游业。 Shihme Asn大坝是土坝。它的树冠高度比平均海平面高133m,长360m,流域763.4 km2,最大体积3.09亿厘米。石门大坝的浊度受到Aere(2004)和Masa(2005)台风的严重影响。 Aere之后的沉积增加了2800万厘米。石门运河入口处的浊度为3000 NTU(浊度法浊度单位)。需要下游通道的泥沙淤积策略。因此,在石门水库上游规划了防淤积河道。最终,隧道通道中的混浊流被绕开,并将其流向下游转移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号