How to shorten the examining and testing time of the GIS equipment anti-mishandling system in substations

机译:如何缩短变电站GIS设备防错系统的检查测试时间

获取原文

摘要

The importance and safety of the anti-mishandling system for the 220kV substations is of top-grade for the operators. But the examining and testing time always lasts several working days, which put a fairly heavy pressure on the operators in the existing state and will also influence the commissioning date of the newly set equipment. This paper discussed how to shorten the examining and testing time of the substations' GIS equipment and enhance the efficiency of such work..
机译:220kV变电站的防误操作系统的重要性和安全性对操作员而言是一流的。但是,检查和测试时间总是要持续几个工作日,这给现有状态的操作员带来了相当大的压力,并且还会影响新设置的设备的调试日期。本文讨论了如何缩短变电站GIS设备的检查和测试时间,提高工作效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号