首页> 外文会议>2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America >Electric diagram conception of a new substation BH Centro 2- Belo Horizonte - Minas Gerais - Brazil
【24h】

Electric diagram conception of a new substation BH Centro 2- Belo Horizonte - Minas Gerais - Brazil

机译:新变电站BH Centro 2-贝洛奥里藏特(Belo Horizo​​nte)的电气原理图-米纳斯吉拉斯州-巴西

获取原文

摘要

This paper presents the electric diagram conception of the new substation BH Centro 2, which will substitute the existent substation BH Centro 1, that currently supplies the central area of Belo Horizonte city. The BH Centro 1 substation is the biggest substation of Cemig Distribution Company, with regard to its transformation capacity (138-13.8 kV – 150 MVA). Operating since 1970, the substation has been showing maintenance problems associates to the difficulty of attainment of spare parts for some equipment and rise of the risk of failure due to its high period of operation. Thus, the construction of a new substation was defined. The conception of the BH Centro 2 substation faced some challenges, due limitations of space, special operational requirements because of medium voltage networks characteristics and short-circuits level limitation. Besides, we tried to avoid the utilization of special equipments, like high impedance transformers and high capacity reactors.
机译:本文介绍了新的变电站BH Centro 2的电气图概念,它将取代现有的变电站BH Centro 1,该变电站目前为贝洛奥里藏特市的中心地区提供电力。就其转换能力(138-13.8 kV – 150 MVA)而言,BH Centro 1变电站是Cemig配电公司最大的变电站。该变电站自1970年开始运营以来,一直显示出维护问题,这些问题与某些设备的备件难以获得以及由于其运行时间长而导致的故障风险增加有关。因此,定义了一个新的变电站的建设。 BH Centro 2变电站的概念由于空间限制,中压网络特性和短路水平限制而面临一些挑战,包括空间限制,特殊操作要求。此外,我们尝试避免使用特殊设备,例如高阻抗变压器和大容量电抗器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号