首页> 外文会议>2010 International Conference on Digital Manufacturing and Automation >Energy Saving Economic Analysis of the Oil Pipeline in Gaosheng When the Second Heat Station Stops Heating
【24h】

Energy Saving Economic Analysis of the Oil Pipeline in Gaosheng When the Second Heat Station Stops Heating

机译:第二热站停止供热时高盛输油管道的节能经济分析

获取原文

摘要

This paper researches on the energy saving economy of the oil pipeline in gaosheng when the second heat station stops heating. First, every month total heat transfer coefficient is calculated according to the historical pipeline operation data and the temperature of the soil at the buried depth with the method of least squares. Second, basing on every month total heat transfer coefficient, the finite-element method is adopted to calculate operational parameters, and all the possible flow patterns and the parameters variation of oil physical characteristics are considered in every element. Subsequently the consumption of the electrical energy and natural gas is calculated according to the operational parameters. At last, the energy saving economic analysis is carried out.
机译:研究了第二热站停止供热时高盛输油管道的节能经济性。首先,根据历史管道运行数据和埋深土壤的温度,采用最小二乘法计算每个月的总传热系数。其次,基于每个月的总传热系数,采用有限元法计算运行参数,并在每个要素中考虑所有可能的流态和油物理特性的参数变化。随后根据运行参数计算电能和天然气的消耗。最后进行了节能经济分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号