Impact of operational scheduling of pumped storage power plant considering excess energy and reduction of fuel cost on power supply reliability in a power system with a large penetration of photovoltaic generations

机译:考虑过剩能源并降低燃料成本的抽水蓄能电站运行调度对光伏发电普及率较高的电力系统中供电可靠性的影响

获取原文

摘要

In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. As a result, the PV generation poses many challenges to system operation. PV generates electricity only in the daytime regardless of power demand. When the daytime power demand is small and PV generation is large, severe imbalance in power demand and supply may occur in the power systems. To mitigate the power imbalance, we propose that pumped storage power plant (PSPP) is used to solve the problem. Usually the PSPP is operated in generator mode in the daytime and in pump mode in the nighttime. However if the power imbalances due to the installation of PV is also to be handled by PSPP then the operating patterns of PSPP have to be modified. Such modification in the operating pattern of PSPP could introduce reliability concerns related to the operation of power systems. Therefore we need to study impact of the operational patterns of PSPP to solve the problems associated with excess power produced by PV on the power supply reliability. In this paper a new method for the effective operating pattern for PSPP taking into consideration the fuel cost and the impact of excess power on the reliability of system operation is presented.
机译:近年来,已经在电力系统中安装了大量的光伏(PV)代。但是,PV的输出功率本质上是随机的和间歇的。结果,PV的产生对系统操作提出了许多挑战。光伏仅在白天发电,而与电力需求无关。当白天的电力需求较小而光伏发电量较大时,电力系统中可能会出现严重的电力需求和供应失衡。为了减轻功率不平衡,我们建议使用抽水蓄能电站(PSPP)来解决该问题。通常,PSPP在白天以发电机模式运行,在夜间以泵模式运行。但是,如果也要通过PSPP处理因安装PV而造成的功率不平衡,则必须修改PSPP的工作模式。 PSPP的运行模式中的此类修改可能会引入与电力系统的运行有关的可靠性问题。因此,我们需要研究PSPP操作模式的影响,以解决与PV产生的过剩功率相关的电源可靠性问题。本文提出了一种考虑到燃料成本和过剩功率对系统运行可靠性的影响的PSPP有效运行模式的新方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号