Field tests on a 35kV/90MVA Superconducting Fault Current Limiter

机译:35kV / 90MVA超导故障限流器的现场测试

获取原文

摘要

We developed a 35kV/90MVA Superconducting Fault Current Limiter (SFCL) and installed it in a transmission network at Puji substation of China Southern Power Grid at the end of 2007. A 72 hour period of trial operation was conducted before the SFCL was commissioned into the grid. This device demonstrated having very low impedance in normal power transmission and no adverse effect on the power network. To fully examine its current limiting capacity, current limiting tests were conducted under artificially imposed short-circuit conditions on July 20, 2009. A series of five different tests, including a fail safe test, were carried out. The experimental results are in good agreement with design expectations. The device's current limiting capacity has been convincingly demonstrated. In this paper, we report some details of these tests and the resultant data.
机译:我们开发了35kV / 90MVA超导故障限流器(SFCL),并于2007年底将其安装在南方电网普济变电站的输电网络中。在SFCL投入运行之前,进行了72小时的试运行。网格。该设备在正常输电过程中具有非常低的阻抗,并且对电网没有不利影响。为了全面检查其限流能力,于2009年7月20日在人为施加的短路条件下进行了限流测试。进行了五项不同的测试,包括故障安全测试。实验结果与设计预期吻合良好。令人信服地证明了该器件的限流能力。在本文中,我们报告了这些测试的一些细节以及所得的数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号