首页> 外文会议>Power and Energy Engineering Conference (APPEEC), 2010 >Post-Evaluating of Wind Power Project Based On AHP Model
【24h】

Post-Evaluating of Wind Power Project Based On AHP Model

机译:基于AHP模型的风电项目后评价

获取原文

摘要

Post-evaluation of wind power construction project has great significance to improve the project decision-making and management, it is the urgent need to improve on post-evaluation theory and method. This paper builds the post-evaluation management system based on the study of post-project evaluation theory, which is suitable for the characteristics of wind power projects, describes indicators, methods and evaluation criteria of this system in detail, applying analytical hierarchy process (AHP) and success appraisal method to do case research. Practice shows that the system of power project post-assessment management we built is scientific, practical, and having the higher expansion value.
机译:风电建设项目的后评价对改善项目决策和管理具有重要意义,迫切需要改进后评价的理论和方法。本文在研究项目后评价理论的基础上,构建了适合于风电项目特点的项目后评价管理系统,并运用层次分析法(AHP)详细描述了该系统的指标,方法和评价标准。 )和成功评估方法来进行案例研究。实践证明,我们建立的电力项目后评估管理系统科学,实用,具有较高的扩展价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号