Analysis of Kita-Hon HVDC Link for Load Frequency Control of Eastern Japan 50-Hz Power System Based on Application of The CampusWAMS

机译:基于CampusWAMS的日本东部50Hz电力系统负荷频率控制的北方高压直流输电线路分析。

获取原文

摘要

The CampusWAMS (campus wide area measurement system) based on phasor measurement units (PMU), which covers ten electric power companies of Japan, has been developed for several years. Based only on practical phasor measurements from the CampusWAMS, the paper presents the analysis of KitaHon HVDC Link for load frequency control of Eastern Japan 50Hz power system. Kita-Hon HVDC Link is practically equipped with automatic frequency control function and serves as only interconnection between Hokkaido side and Honshu side of Eastern Japan 50-Hz system. Therefore, it must have certain effects on the load frequency control of both sides. The analysis is carried out using phasor measurements under normal operating condition as well as during the period of a system disturbance. Particularly, the correlation between the frequency deviations of both sides is investigated when Kita-Hon HVDC Link is in operation and out of service, respectively. The effect and its characteristics of Kita-Hon HVDC Link on load frequency control of Eastern Japan 50-Hz power system is observed and concluded based on the analysis results.
机译:基于相量测量单元(PMU)的CampusWAMS(校园广域测量系统)已经开发了数年,该系统覆盖了日本的十家电力公司。仅基于来自CampusWAMS的实际相量测量,本文对用于日本东部50Hz电力系统负载频率控制的KitaHon HVDC Link进行了分析。 Kita-Hon HVDC Link实际上具有自动频率控制功能,并且仅作为日本东部50-Hz系统的北海道侧与本州侧之间的互连。因此,必须对双方的负载频率控制产生一定的影响。该分析是在正常工作条件下以及系统扰动期间使用相量测量进行的。特别是,分别研究了Kita-Hon HVDC Link处于运行状态和停止运行时双方频率偏差之间的相关性。观察并总结了北本高压直流输电线路对日本东部50-Hz电力系统负荷频率控制的影响及其特点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号