首页> 外文会议>;Irrigation district sustainability-strategies to meet the challenges: Abstracts >MODERNIZATION IMPROVEMENTS — OPTIONS, DECISIONS ANDIMPLEMENTATION AT OAKDALE IRRIGATION DISTRICT
【24h】

MODERNIZATION IMPROVEMENTS — OPTIONS, DECISIONS ANDIMPLEMENTATION AT OAKDALE IRRIGATION DISTRICT

机译:现代化改进—奥克达勒灌区的选择,决策和实施

获取原文

摘要

Facing a magnitude of issues including failing infrastructure, water rights challenges, andlow water use efficiency, the Oakdale Irrigation District (OID) Board of Directors votedin 2004 to develop a Water Resource Plan (WRP) to guide the District for the next 20years. The WRP was finalized and adopted by the Board in November 2005 with the fivefollowing goals stated:1. Provide long-term protection to OID’s water rights2. Address federal, state and local water challenges3. Rebuild/modernize an outdated system to meet changing customer needs4. Develop affordable ways to finance improvements5. Involve the public in the planning processAll of the stated goals are interrelated and progress on one has ancillary benefits toothers. This paper will predominately focus on the rebuilding and modernizing effortsthe OID has implemented since the adoption of the WRP, with major focus on themodernization of the District’s diversion structures. This paper will discuss the manyoptions available for modernization, the decision process on the path selected, and theimplementation of projects to achieve modernization.
机译:面临一系列问题,包括基础设施故障,水权挑战和 用水效率低下,奥克代尔灌区(OID)董事会投票通过 在2004年制定了水资源计划(WRP),以指导该地区未来20年 年。 WRP于2005年11月由董事会最终确定并通过。 阐明了以下目标: 1.为OID的水权提供长期保护 2.应对联邦,州和地方的用水挑战 3.重建/现代化过时的系统,以满足不断变化的客户需求 4.开发负担得起的方法来资助改进 5.让公众参与规划过程 所陈述的所有目标都是相互关联的,并且在一个目标上取得的进展对 其他。本文将主要侧重于重建和现代化工作 自WRP通过以来,OID一直在实施,主要侧重于 地区分流结构的现代化。本文将讨论许多 可用于现代化的选项,所选路径的决策过程以及 实施项目以实现现代化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号