首页> 外文会议>International wood composites symposium >LATERAL REHABILITATION - CASE STUDY AND NEXT STEPS FOR THE CITY OF HAMILTON
【24h】

LATERAL REHABILITATION - CASE STUDY AND NEXT STEPS FOR THE CITY OF HAMILTON

机译:横向修复-哈密尔顿市的案例研究和后续步骤

获取原文

摘要

In 2006/2007 the City of Hamilton tendered a city-wide program for trenchless rehabilitation of 350 laterals. Due to insufficient funding the contract was not awarded. Changes in the identification of defective laterals and broader product availability resulted in the City revisiting the tendering process for this large pilot project. As with most municipalities, finding a cost effective solution to lateral rehabilitation is a difficult undertaking. The City of Hamilton has re-tendered and awarded a large-scale, city-wide contract for rehabilitation of sewer laterals.Hamilton City Council decided the municipality would assume operation and maintenance responsibility for all service laterals from the mainline sewer to the property line, effective March 1, 2006, although private ownership of the entire lateral remains in place. With nearly 250,000 active sewer laterals, many older than 100 years, this new responsibility became a challenging task requiring a city-wide program approach.This paper will present a review of the creation, modification and implementation of the City of Hamilton's trenchless sewer lateral rehabilitation program, as well as lessons learned by the City. This program includes the mainline sewer connection and the lateral pipeline to the property line. The paper will discuss how the program was accomplished including technology reviews, differences between the original and new tenders which lead to a successful program, and obstacles encountered in each step along the way.
机译:2006/2007年,汉密尔顿市招标了一个城市为350侧面的艰苦康复计划。由于资金不足,合同未授予。缺陷横向和更广泛的产品可用性的变化导致了该市重新审视了这一大型试点项目的招标过程。与大多数城市一样,寻找横向康复的成本效益的解决方案是一个艰难的事业。汉密尔顿市重新招标并获得了大规模的城市范围内的康复康复的康复。 汉密尔顿市议会决定,该市将对主线下水道的所有服务侧面承担运营和维护责任,从2006年3月1日起生效,尽管整个侧向的私人所有权仍然存在。对于近250,000个活跃的下水道横向,许多超过100年,这一新责任成为一个具有挑战性的任务,需要城市范围的节目方法。 本文展会审查汉密尔顿城市横向康复计划的创作,修改和实施,以及城市汲取的经验教训。该程序包括主线下水道连接和横向管道到物业线。本文将讨论该计划的完成方式,包括技术评审,原始和新招标之间的差异,导致成功的程序,以及在路上的每一步中遇到的障碍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号