PIPELINE INTEGRITY EXCAVATION CHALLENGE IN A HIGH CONSEQUENCE AREA

机译:高后果区域的管道完整性开挖挑战

获取原文

摘要

A portion of Enbridge Pipelines 30 inch crude oil/NGL pipeline runs from Bay City, Michigan to Sarnia, Ontario. A geometry tool found a topside dent indication and GPS data indicated that the dent was located in the Saginaw River which is considered Coast-guard navigable. This pipe segment is located within a defined high consequence area making Pipeline and Hazardous Materials Safety Administration (PHMSA) timing applicable. On top of the normal problems associated with digging in a river, the riverbed soil was known to contain dioxin contamination related to its industrial history.This paper provides an overview of the practical problems encountered in completing this dig. Governmental construction permitting proved to be the most difficult aspect of the work. Contaminated soils caused Enbridge to hire a specialized water handling company. Significant engineering challenges included design and installation of a 100 × 50 foot coffer dam with 70 foot long sheets. The coffer dam design required a flood plain erosion study. After many months of permitting process, all required permits were obtained and construction was started.The construction included three major elements, water handling, coffer dam installation and excavation of the suspected defect. After 2 months of work to uncover the suspected dent, it was located and analyzed. The dent did not meet Enbridge repair criteria, but mechanical reinforcement was installed as a precaution. Final steps included backfilling and coffer dam removal. From start to finish the construction portion of the dig took about 5 months to complete.
机译:一部分Enbridge管道30英寸原油/ NGL管道从密歇根州的贝城(Bay City)到安大略省的萨尼亚(Sarnia)。几何工具找到了顶部凹痕指示,GPS数据表明该凹痕位于萨吉诺河(Saginaw River)中,该河被认为是海岸警卫队可通航的。该管段位于已定义的高风险区域内,因此适用于管道和危险材料安全管理局(PHMSA)的时间安排。除了与在河流中挖掘相关的常规问题之外,已知河床土壤还含有与其工业历史有关的二恶英污染。 本文概述了完成此挖掘过程中遇到的实际问题。政府建设许可被证明是工作中最困难的方面。受污染的土壤使Enbridge雇用了一家专业的水处理公司。工程上的重大挑战包括设计和安装一个长70英尺长的100×50英尺的围堰。围堰设计需要进行洪水平原侵蚀研究。经过数月的许可过程,所有必需的许可均已获得并开始施工。 该建筑包括三个主要要素:水处理,围堰安装和可疑缺陷的挖掘。经过2个月的工作以发现可疑的凹痕,找到并分析了凹痕。该凹痕不符合Enbridge的维修标准,但为预防起见安装了机械加固。最后的步骤包括回填和围堰拆除。从开始到完成,挖坑的施工部分花费了大约5个月的时间才能完成。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号