Medium Radius Horizontal Sidetracks Reduce Time, Cost and Risks in HT Ghawar Field Wells

机译:中等半径的水平边距可减少HT Ghawar田井的时间,成本和风险

获取原文

摘要

Saudi Aramco's first medium radius horizontal sidetrack gas well, Haradh-AX1, was drilled and completed in June, 2008 in a record time of 48.7 days with 4,989 ft of reservoir contact and a 33% reduction in overall cost. The previous, Khuff-C Horizontal sidetracks which included the same operations; de-completion, sidetracking and re-completion, averaged 83 days with 3,441 ft of sidetracked lateral across the Khuff-C. Directional drilling in the medium radius lateral after building at 12°/100 ft to a sail inclination of 88° was characterized by better bit performance, lower torque and drag, improved wellbore stability and steerability. In the previously employed long radius horizontal sidetrack design, extensive milling operations were required to gain access to the 8-3/8" open hole to sidetrack. The 8-3/8"long radius build section would then be drilled from the Base Jilh Dolomite, across the troublesome and sometimes abnormally pressured Lower Jilh and Sudair Shale formations to the top of the Khuff-C where a new 7" liner would be run and cemented. The 5-7/8" lateral would then be drilled across the Khuff-C and an open-hole completion run. In the medium radius design, the sidetrack (ST) could be made deeper, in the same pressure regime, by cutting a ST window in the existing 7" liner 450 ft true vertical depth (tvd) above the Khuff-C target reservoir, kicking off and drilling 5-7/8" hole across the Khuff-C to total depth (TD). This paper further details the time and cost savings possible from the application of proven medium radius drilling technology from Saudi Aramco's Arab-D Horizontal Oil wells produced from 6,500 ft tvd to the deep gas wells produced from the Khuff formation at 12,000 ft tvd, a new drilling environment. More medium radius horizontal sidetracks are planned and a similar medium radius Khuff-B Horizontal ST, ANDR-AX1, which built at 32°/100 ft, was just successfully completed at 14,819 ft with a 2,400 ft horizontal section.
机译:沙特阿拉姆公司的第一媒体半径水平侧面侧面侧面侧面铺设储气井,Haradh-Ax1在2008年6月钻探并完成了48.7天的记录时间,储层联系4,989英尺,总成本降低了33%。以前的khuff-c水平侧面,包括相同的操作;完成,侧面侧面和重新完成,平均为83天,横跨KHuff-C侧侧侧面3.44英尺。通过更好的比特性能,扭矩和拖动,提高井筒稳定性和测距,在88°以88°的帆延伸到88°的帆船倾斜度下,在介质半径横向横向钻孔。在以前采用的长半径水平侧面设计中,需要广泛的铣削操作来获得进入侧面的8-3 / 8“开孔。然后将从基座吉尔钻出8-3 / 8”长的半径构建部分白云石,跨越麻烦,有时异常压迫下吉尔和Sudair Shale地层到Khuff-C的顶部,其中一个新的7“衬里将被运行和巩固。然后将在Khuff上钻出5-7 / 8”横向钻孔-c和开放孔完成运行。在介质半径设计中,通过在现有的7“衬里450FT真正的垂直深度(TVD)上方的现有7”衬垫450FT真正的垂直深度(TVD)中,踢动窗口,可以在相同的压力制度中更深地。关闭和钻到3-7 / 8“孔,横跨Khuff-C到总深度(TD)。本文进一步详细介绍了从沙特阿拉姆科的ARAMCO钻井技术的应用中可能的时间和成本节省的时间和成本可以从6,500英尺TVD到由Khuff Clorting生产的深气井生产的Saudi Aramco的卧式油井,这是一个新的钻井环境。有计划更多的介质半径水平侧面,并在32°/ 100英尺处建立的类似介质半径-B水平ST,ANDR-AX1,刚刚成功地完成了2,400英尺水平部分的14,819英尺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号