WHATEVER IT TAKES FROM WATER AVAILABILITY MODEL TO COST OF WATER

机译:从水可用性模型到水成本的一切取舍

获取原文

摘要

This paper summarizes ongoing efforts by the Water Resources Division atAurora Water to determine the cost of Raw Water for the City of Aurora. Aurora iscurrently developing, at a cost of approximately 700 million dollars, a new watersupply and delivery system, the Prairie Waters Project (PWP). This project will act asan additional source of water supply. The project is designed to divert Aurora’sreusable return flows from the lower South Platte River, pump them back to the City,and, after suitable treatment, reintroduce them into the City’s potable water system. Inaddition, Aurora Water staff is diligently pursuing the acquisition of storage andagricultural water rights in the South Platte River north of the Denver MetropolitanArea. Purchased agricultural water will be transferred to municipal use to supplementreclaimed water in order to provide for future population growth. Using results fromthe water availability model, and established budgeting procedures, staff at AuroraWater is taking the necessary steps to determine the cost of raw water.This complex system of water supply raises the following question: What is the actualcost of water? Finding the answer to that question is not a small task.Information to establish the cost of water is obtained by combining data from theAurora Water adopted budget, the proposed construction costs and the cost ofacquiring water rights and storage in the lower South Platte River.
机译:本文总结了水资源司在 Aurora Water确定Aurora市原水的成本。极光是 目前正在开发耗资约7亿美元的新水 供应和交付系统,草原水域项目(PWP)。该项目将充当 额外的水源。该项目旨在转移Aurora的 来自南普拉特河下游的可重复使用的回流,将它们抽回城市, 经过适当的处理后,将它们重新引入纽约市的饮用水系统。在 此外,Aurora Water员工正在努力追求收购存储和 丹佛大都会以北的南普拉特河的农业用水权 区域。所购买的农业用水将转为市政用水以补充 再生水以提供未来的人口增长。使用来自的结果 水供应模型和已建立的预算程序,Aurora的工作人员 水正在采取必要步骤来确定原水的成本。 这个复杂的供水系统提出了以下问题:实际的供水量是多少? 水费?找到该问题的答案并非易事。 通过组合来自以下方面的数据来获得确定水价的信息: Aurora Water通过了预算,拟议的建筑成本和 在南普拉特河下游获得水权和存储权。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号