首页> 外文会议>2009 rapid excavation and tunneling conference proceedings >THE COST AND BENEFIT OF THE PHASE 2 INVESTIGATION FOR THE REACH 4 TUNNEL, HOW A ROLL OF THE DICE CAME UP BIG IN LAS VEGAS
【24h】

THE COST AND BENEFIT OF THE PHASE 2 INVESTIGATION FOR THE REACH 4 TUNNEL, HOW A ROLL OF THE DICE CAME UP BIG IN LAS VEGAS

机译:到达4隧道的第二阶段调查的成本和收益,拉斯维加斯的掷骰子成倍增加

获取原文

摘要

The subsurface investigation for the Reach 4 Tunnel was expected to be completed in a single phase. This assumed that data from two nearby previous tunnels, combined with limited new subsurface information and surface mapping would be sufficient to characterize the rock behavior. Unforeseen rock conditions and complex faulting led to the recommendation for a second phase. This decision was not reached easily, as much of the follow-on work required helicopter support, and associated costs. The second phase of drilling found significantly more variability than the first phase and led to a very different and better understanding of the geologic and geotechnical conditions, and rock characterization.
机译:达到4隧道的地下调查预计将在单阶段完成。这假设来自两个附近的先前隧道的数据,与有限的新地下信息和表面映射相结合,可以足以表征岩石行为。不可预见的岩石条件和复杂断层导致第二阶段的推荐。该决定未容易达成,正如我们所需的后续工作所需的直升机支持以及相关成本。第二阶段的钻孔阶段发现比第一阶段更具可变性,并导致对地质和岩土工程和岩石表征的非常不同和更好的理解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号