【24h】

GIS-Based Visual Simulation of the Underground Transformer Substation Construction

机译:基于GIS的地下变电站施工可视化仿真。

获取原文

摘要

By use of 3D dynamic visual simulation technology based on GIS,this paper puts forward a suit of construction system of 3D visual digital modal and construction process simulation methods for pit foundation.Graphical modeling and dynamic simulation of the entire construction process visualization was realized.At first,the 3D geologic strata model is realized according to pre-results of our research group,the 3D visual digital model construction method and corresponding standard database establishment are discussed,and then according to the relational database,the whole up-down construction method of pit foundation construction process dynamic simulation path is set up.The graphical modeling facilitates the establishment of simulation model by combining graphic model elements based on hierarchical modular modeling theory.The entire process uses discrete event system simulation basic concept,adjusts to use relational database,and carries out construction model combination.Combining the whole and detail simulation states,the paper carries out the entire dynamic construction progress simulation,and at last develops a large 3D visual simulation system of pit foundation based on the World Expo 500kV transformer substation pit foundation of Shanghai World Exhibition.
机译:利用基于GIS的3D动态视觉仿真技术,提出了一套适合坑基的3D视觉数字模态施工系统和施工过程仿真方法,实现了整个施工过程可视化的图形建模和动态仿真。首先根据研究小组的研究成果实现了3D地质地层模型的建立,讨论了3D可视数字模型的建立方法和相应的标准数据库的建立方法,然后根据关系数据库进行了整体上下构造方法的研究。建立了基坑施工过程的动态仿真路径。图形建模通过结合基于分层模块化建模理论的图形模型元素,促进了仿真模型的建立。整个过程采用离散事件系统仿真的基本概念,调整为使用关系数据库,并进行施工模型组合。孔和细节模拟状态,进行了整个动态施工进度模拟,最后开发了基于上海世博会的500kV变电站变电站基坑的大型3D可视化基坑模拟系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号