首页> 外文会议>Seventeenth International Symposium on Mine Planning and Equipment Selection(MPES 2008)(第十七届矿山规划和设备选型国际研讨会)论文集 >Investigation on the subsidence prediction and reclamation planning of the Subsidence in Jinqiao Mine of Shandong Province, china
【24h】

Investigation on the subsidence prediction and reclamation planning of the Subsidence in Jinqiao Mine of Shandong Province, china

机译:山东省金桥矿沉陷的预测及围岩方案的研究

获取原文

摘要

Through status analysis of coal mining in Jinqiao Mine, combined with Occurrence Features of Coal Seam,use probability integral method,select suitable coefficients,this paper predict the subsidence of Jinqiao Mine of Shandong Province in china,obtain the biggest subsidence value,the area of water-logged zone and the distribution of water-logged zone. Through the comparison of the model and reality,the paper prove it is a reliable end that is predicted. On this basis of prediction results,Based on the principle of reclamation while mining,the paper analysis two aspects that is general layout and engineering design,and do the planning and design about synthetic reclamation of subsidence. This reclamation includes water area,plant cover and so on. it provide evidence for the reclamation of the mine environment.
机译:通过锦桥矿煤炭开采现状分析,结合煤层的发生特征,采用概率积分法,选择合适系数,本文预测山东省山东省的沉降,获得了最大的沉降价值,地区水路区和水路区的分布。通过对模型与现实的比较,本文证明这是一个可靠的结束。在这种基础上,基于挖掘的填海原理,造纸分析了一般布局和工程设计的两个方面,并进行了关于余剩综合回收的规划和设计。这种填海工厂包括水域,植物盖等。它为矿井环境的回收提供了证据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号