JUSTIFICATION AND MANUFACTURING QUALITY ASSURANCE FOR THE USE OF HOT ISOSTATICALLY PRESSED, REACTOR COOLANT SYSTEM COMPONENTS IN PWR PLANT

机译:在压水厂中使用热等静压反应器冷却剂系统组分的合理性和制造质量保证

获取原文

摘要

This paper presents an overview of the work undertaken by Rolls-Royce to introduce Hot Isostatically Pressed (HIP) components into Pressurised Water Reactor plant. It presents the work from a design justification and manufacturing quality assurance perspective, rather than from a pure metallurgical perspective, although some metallurgical and mechanical property comparisons with the traditional forged material are presented.Although the HIP process is not new, it was new in its application to Rolls-Royce designed nuclear reactor plant. In order to satisfy the regulatory requirement of 'Proven Engineering Practices' with regard to the introduction of new material processes, and to provide a robust manufacturing substantiation leg of a multi-legged safety case, Rolls-Royce has implemented an evolving, staged approach, starting with HIP bonding of solid valve seats into small bore valve pressure boundaries. This was followed by powder HIP consolidation of leak-limited, thin-walled toroids, and has culminated in the powder HIP consolidation of components, such as steam generator headers, large bore valves and pipe sections. The paper provides an overview of each of these stages and the approach taken with respect to justification.The paper describes the benefits that Rolls-Royce has realised so far through the introduction of HIPed components, and improvements planned for the future. Structural integrity benefits are described, such as improved grain structure, mechanical properties, and ultrasonic inspection. Project-based benefits are also described, such as provision of an alternative strategic sourcing route, cost and lead-time reduction.A full description is provided of key quality assurance steps applied to the process to ensure a high quality product is delivered commensurate with a high integrity nuclear application.
机译:本文概述了罗尔斯·罗伊斯公司将热等静压(HIP)组件引入压水反应堆工厂的工作。尽管从冶金学和机械性能方面与传统锻造材料进行了一些比较,但它从设计合理性和制造质量保证的角度介绍了这项工作,而不是从纯粹的冶金学角度介绍了这项工作。 尽管HIP工艺不是新生事物,但它在劳斯莱斯设计的核反应堆工厂中的应用又是新事物。为了满足有关“采用新材料工艺”的“成熟工程实践”的法规要求,并为多腿安全案例提供可靠的制造依据,罗尔斯·罗伊斯公司采用了逐步发展的方法,首先从实心阀座的HIP粘结到小口径阀压力边界。随后是泄漏受限的薄壁环形粉末的粉末HIP固结,最终达到了零件的粉末HIP固结,例如蒸汽发生器集管,大口径阀门和管段。本文概述了这些阶段中的每一个阶段以及针对证明所采取的方法。 本文介绍了罗尔斯·罗伊斯公司迄今为止通过引入HIPed组件而实现的收益,以及为未来计划的改进。描述了结构完整性的好处,例如改进的晶粒结构,机械性能和超声检查。还描述了基于项目的收益,例如提供替代性战略采购路线,降低成本和缩短交货时间。 完整描述了应用于过程的关键质量保证步骤,以确保交付高质量的产品,并与高完整性核应用相称。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号