【24h】

A Case for System Acceptance - Progressive Assurance Practices on the East London Line Project

机译:系统验收的案例-东伦敦线项目的渐进保证实践

获取原文

摘要

The final product of the East London Line Project (ELLP), and hence the 'ELL System' to be accepted, is a fully operational railway comprising an infrastructure, rolling stock and operational resources and processes. The project has defined a structure for progressively decomposing the ELL System into 'Levels' as first the requirements and then products are developed and has also defined a comprehensive argument structure for collecting systems assurance evidence which builds up a robust 'Technical Case' as the project progresses through its engineering lifecycle towards final system acceptance. This paper describes some of the fundamental systems engineering concepts and principles, which provide an important structured framework for 'Progressive Assurance'. To conclude the paper lessons learned to date are reported and recommendations for future application of the methodology are made.
机译:东伦敦线项目(ELLP)的最终产品以及因此被接受的“ ELL系统”是一条全面运营的铁路,包括基础设施,机车车辆以及运营资源和流程。该项目已定义了一种结构,该结构用于将ELL系统首先分解为“需求”,然后再开发产品,还定义了用于收集系统保证证据的综合论证结构,从而建立了稳健的“技术案例”作为项目在其工程生命周期内朝着最终系统验收的方向发展。本文介绍了一些基本的系统工程概念和原理,它们为“渐进保证”提供了重要的结构化框架。总而言之,报告了迄今为止所学到的经验教训,并为该方法的未来应用提出了建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号