HYDRAULIC ANALYSIS OF HUAIHE RIVER CLOSURE FOR LINHUAIGANG FLOOD CONTROL PROJECT

机译:临淮岗防洪工程淮河闭口水力分析。

获取原文

摘要

For analyzing the final closure hydraulics parameters of Linhuaigang flood control project in Huaihe river, the mathematics model is established in terms of St.Venant equations. Through hydraulics calculation, the parameters variation of the two conditions, fixed position sink ship adoption and no adoption of fixed position sink ship, is discussed. Using judge standard of closure difficulty, the effect of adopting fixed position sink ship technique to reduce closure difficulty is conclusive. According to the riprap grain size calculation theory for closure by vertical blockade, the paper evaluates the necessity of adopting single embankment and final closure with two directions programme, which provides the theories basis for closure programme delivery.
机译:为了分析淮河临淮岗防洪工程最终封闭水力学参数,建立了基于St.Venant方程的数学模型。通过水力计算,讨论了固定位置沉船采用和不采用固定位置沉船两种条件下的参数变化。根据关闭难度的判断标准,采用固定位置沉船技术降低关闭难度的效果是结论性的。根据竖向封闭的riprap粒度计算理论,评估了采用单路堤和最终封闭两个方向方案的必要性,为实施封闭方案提供了理论依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号