【24h】

ANALYZING OF STABLE SLOPE IN TIDAL SUPPLY CANALS (CASE STUDY-IRAN)

机译:潮汐供应渠稳定边坡分析(案例研究-伊朗)

获取原文

摘要

Shrimp farms in North TIAB in south of Iran with 50 shrimp farms (each farm has 20 ha. area) supply its water requirement from two canals. The width of these canals is variable between 6 to 17 meters. Two tidal earth canals convey sea water toward farms by gravity force and each farm pump its water requirement from these canals during 12 hours. The water fluctuation is including of 2 high tides and 2 low tides in 24 hours. Also different between high and low tide is about 3 meters.Now, sedimentation of supply canal in this site is the importance problem. So that after every 3 years sediment height in end of canal is increasing 1.5 to 2 meters and because of these sediments the farms can not pump water for enough time and the cost of dredging is so much for farmers and fishery. This study analyzed the stable longitudinal slope of canals so that sedimentation and erosion in canals decrease in minimum condition. In this study from MIKE11 software for analyzing of one dimensional sedimentation and erosion in supply canal was used.
机译:伊朗南部TIAB北部的虾养殖场有50个虾养殖场(每个养殖场面积20公顷)都通过两条运河来满足其用水需求。这些运河的宽度在6至17米之间变化。两个潮汐土渠通过重力将海水输送到养殖场,每个养殖场在12小时内从这些运河抽水。水的波动在24小时内包括2条高潮和2条低潮。高潮和低潮之间也相差约3米。现在,该地点的供应渠沉淀是重要的问题。因此,每3年,运河末端的沉积物高度将增加1.5到2米,由于这些沉积物,农场无法抽水足够的时间,而疏farmers的成本对农民和渔业而言是巨大的。这项研究分析了运河的稳定纵向坡度,以便在最小条件下减少运河的沉积和侵蚀。在这项研究中,使用了MIKE11软件来分析供应渠中的一维沉降和侵蚀。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号