首页> 外文会议>Offshore Technology Conference(OTC 08): Waves of Change >Engineering Considerations for Offshore FSRU LNG Receiving Terminals
【24h】

Engineering Considerations for Offshore FSRU LNG Receiving Terminals

机译:海上FSRU LNG接收站的工程考虑

获取原文

摘要

This paper discusses several key engineering considerations related to the FSRU (floating storage and regasification unit) system concept for offshore floating LNG (liquefied natural gas) receiving terminals based on the author's past project experience. It is not intended to provide an all-inclusive state-of-the-art review of offshore LNG transfer technology but rather to provide LNG project personnel with some valuable technical guidance during early phase of a FSRU project. The discussions in this paper cover important considerations for overall system marine operability, berth availability assessment, and preliminary design considerations of the FSRU system.
机译:本文基于作者过去的项目经验,讨论了与海上浮动LNG(液化天然气)接收站的FSRU(浮动存储和再气化单元)系统概念相关的几个关键工程考虑因素。它不旨在提供对海上LNG传输技术的全方位全面审查,而是在FSRU项目的早期阶段为LNG项目人员提供一些有价值的技术指导。本文的讨论涵盖了整个系统海上可操作性,泊位可用性评估的重要考虑因素,以及FSRU系统的初步设计考虑因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号