首页> 外文会议>MultiMedia and Information Technology, 2008. MMIT '08 >Research on Multi-objective Optimization of Lean Construction Project
【24h】

Research on Multi-objective Optimization of Lean Construction Project

机译:精益建设项目的多目标优化研究

获取原文

摘要

Time, cost, quality and resources, with mutual influence, are the four major control items for the general contractor in lean construction project. The best solution is to achieve high quality with low cost in a proper time limit, and the resources get possibly fully use and keep balance. Based on coordination theory and system science, this paper puts forward a framework of multi-object coordination management. The concepts of efficacy coefficient and system coordination degree are introduced, object system efficacy function of time, cost, quality and resources is set up respectively, the model of multi-object system coordination degree of lean construction management is proposed and arithmetic of particle swarm optimization is applied to model optimizing.
机译:相互影响的时间,成本,质量和资源是精益建设项目总承包商的四个主要控制项目。最好的解决方案是在适当的时限内以低成本实现高质量,并且资源可能会得到充分利用并保持平衡。基于协调理论和系统科学,提出了一种多目标协调管理框架。介绍了效能系数和系统协调度的概念,分别建立了时间,成本,质量和资源的目标系统效能函数,提出了精益施工管理的多目标系统协调度模型,并提出了粒子群优化算法。用于模型优化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号