首页> 外文会议>工业工程与系统管理2007年国际会议(International Conference on Industrial Engineering and Systems Management)(IESM 2007)论文集 >A Meta heuristic method for Multi Mode Resource Constrained Project Scheduling Problem with Consideration of Time Value of Money
【24h】

A Meta heuristic method for Multi Mode Resource Constrained Project Scheduling Problem with Consideration of Time Value of Money

机译:考虑货币时间价值的多模式资源受限项目调度的元启发式方法

获取原文
获取外文期刊封面目录资料

摘要

This paper presents a new model considering the negative cash flows in the activities of projects with the objective of maximizing the discounted cash flows. In this model, the activity can be done in several modes where the selection of a mode determines the completion time and the amount of resource consumption for that activity. Since Multi Mode Resource Constrained Project Scheduling Problem with Discounted Cash flows (MMRCPSPDC) is highly NP-hard, certain metaheuristic methods of Simulated Annealing (SA) and Tabu Search (TS) have been utilized as solution methods in this study. These two algorithms have proved to be effective in solving problems with positive cash flows. The method of bidirectional scheduling of activities, provided by Selle and Zimmerman [36] for RCPSPDC problem, has been applied to establish the initial solution, and the effect of using this algorithm [36] to improve the performance of SA and TS has been studied. Then, we compare the performance of the two methods of SA and TS in solving MMRCPSPDC when we have negative cash flows as well as positive ones.
机译:本文提出了一种新模型,该模型考虑了项目活动中的负现金流量,目的是使折现现金流量最大化。在此模型中,可以在几种模式下完成活动,其中模式的选择决定了该活动的完成时间和资源消耗量。由于带有折现现金流的多模式资源受限项目计划问题(MMRCPSPDC)具有很高的NP难性,因此在本研究中使用了某些模拟启发式(SA)和禁忌搜索(TS)的元启发式方法。事实证明,这两种算法对于解决现金流量为正的问题都是有效的。 Selle和Zimmerman [36]针对RCPSPDC问题提供的双向活动调度方法已被用于建立初始解决方案,并且研究了使用该算法[36]来提高SA和TS性能的效果。 。然后,当现金流量为负时,我们比较了SA和TS两种方法在解决MMRCPSPDC方面的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号