【24h】

Polynomial Time Solution Methods for Some Cross-Docking Problems

机译:一些交叉配送问题的多项式时间求解方法

获取原文

摘要

A Cross docking platform has input and output doors. It receives products from different origins. Products have to be sent in different destinations. Costs are related to the vehicles' waiting times, to the double manipulations (items that can not be moved directly from a truck to another) and to the trucks' additional manipulations (outgoing trucks temporary moved to a parking area). Degrees of freedom include input scheduling, output scheduling, truck shifting policy and loading policy. This article focuses on sub problems with a single input door, a single output door and a single outgoing semi-trailer in each direction. Several polynomial case are identified.
机译:Cross对接平台具有输入和输出门。它接收来自不同来源的产品。产品必须发送到不同的目的地。成本与车辆的等待时间,双重操纵(不能直接从卡车移至​​另一辆卡车的项目)以及卡车的其他操纵(即将移出的卡车临时移至停车位)有关。自由度包括输入计划,输出计划,卡车转移策略和装载策略。本文重点介绍在每个方向上具有单个输入门,单个输出门和单个输出半挂车的子问题。确定了几个多项式的情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号