Re-restoration on the South Platte repairs flawed attempt at restoration

机译:在南板覆盖恢复恢复时重新修复

获取原文

摘要

A flawed attempt at fishery enhancement caused great disappointment for this private property owner on the Middle Fork of the South Platte near Fairplay, Colo. A consultant had attempted to enhance the fishery by creating deep pools and complex habitat features. More than 200 large boulders were added to the stream in various configurations, and unnaturally deep holes were dredged in the channel. Many of the side channels, which historically served as flood relief channels and backwater spawning habitat, also were filled with the dredged material. At the property owner's request, Trout Headwaters, Inc. assessed the site and documented what the property owner suspected: the flawed design and installation had resulted in a poorly functioning stream system.The placement of boulders and dredge and fill activities had restricted the floodplain; and decreased water velocity caused fine sediments from upstream to accumulate in deepened pools. The altered hydrologic regime triggered increased erosion and reduced the width of the riparian corridor. In addition, the majority of backwater habitat had been removed by filling braided channels, and large boulders placed across the entire stream channel altered the natural riffle/run ratio. This project is what THI refers to as "re-restoration", where a prior attempt at stream enhancement and restoration has actually caused harm to the system. To achieve a stable and self-maintaining channel morphology, with riffle and pool elevations and ratios that can be naturally maintained by spring runoff, more than 90 instream boulders imported by the prior consultant were adjusted in location and elevation. To minimize site disturbance, a modified excavator with large rubber tires and fully rotating arm, nicknamed "the spider," was used to carefully reach and place materials without causing the problematic soil compaction of heavier, track excavating equipment. The new design and installation allows fine sediments to be transported through the channel without active maintenance, and prevent pools and spawning gravels from acting as sediment traps. Point bars were re-graded and side channels reopened to allow floodplain access, promote flood relief, and restore backwater spawning habitat. To maintain these desirable morphologies, THI installed bank stabilizing erosion control fabrics, toe stabilization materials, and willow plantings to provide structural root support along suitable reaches. Revegetation of these banks will increase biodiversity, add shade and cover, and provide ideal edge habitats for fish.
机译:渔业增强的有缺陷的尝试导致这位私人财产所有者对南普拉戈附近的南普拉特中间叉的令人瞩目的失望。一位顾问试图通过创造深井和复杂的栖息地特征来加强渔业。在各种配置中将超过200个大的巨石添加到流中,并且在通道中疏浚不自然的深孔。许多侧面渠道,历史上担任洪水释放渠道和背水栖息地,也充满了疏浚材料。在业主的要求,鳟鱼Headwaters,Inc。评估了该网站并记录了物业所有者怀疑的内容:缺陷的设计和安装导致流动系统运行不佳。巨石和疏浚和填补活动的位置限制了洪泛区;减少水速度导致从上游引起细粒度,积聚在加深的池中。改变的水文制度触发侵蚀增加并降低了河岸走廊的宽度。此外,通过填充编织通道除去了大部分后水栖息地,并且放置在整个流通道上的大巨石改变了自然的升级/运行比。该项目是THI指的是“重新恢复”,其中河流增强和恢复的现有尝试实际上对系统造成了伤害。为了实现稳定和自我保持的通道形态,升级和池升高和可以自然而然地由弹簧径流保持的比例,在地点和海拔地区调整了先前顾问进口的90多个乐器巨石。为了最大限度地减少现场障碍,用大型橡胶轮胎和完全旋转臂的改进的挖掘机,绰号“蜘蛛”,用于小心地达到和放置材料而不会导致较重的轨道挖掘设备的有问题的土壤压实。新的设计和安装允许通过频道运输的细沉积物,无需主动维护,并防止池和产卵砾石作为沉积物陷阱。点栏重新分级,侧面通道重新开放,以允许洪泛区进行进入,促进洪水缓解,并恢复回水产卵栖息地。为了维持这些理想的形态,THI安装的银行稳定侵蚀控制织物,趾稳定材料和柳树种植,以提供沿着合适的结构根部支撑。这些银行的重新预算将增加生物多样性,加入阴影和封面,并为鱼提供理想的边缘栖息地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号