Riverbank Restoration with Native Wildflowers and Turf Reinforcement Mats

机译:河岸恢复与本地野花和草皮加固垫

获取原文

摘要

In 2002, the City of Indianapolis, Indiana was presented with a problem along the White River shoreline. Riverbank erosion was exposing landfill waste as well as a petroleum pipeline. Due to limited space within the city limits, the landfill was positioned on land adjoining the river, and the pipeline was located following the natural banks of the river. Because of their proximity to the natural waterway, any shoreline erosion posed a threat to the environmental quality of the water. With EPA funding available for only a short time, the City of Indianapolis needed a quick and affordable solution. Restoration of the shoreline with native vegetation that included a wide range of wildflowers was a critical factor to the City. They found a solution in a permanent polypropylene fiber composite turf reinforcement mat. Installation began in April 2003 and continued until October 2003. During the course of the project, the area was subjected to six high flow water events, the first in April and the last, a 9 inch rainfall on Labor Day. After many of the storm-events, the complete inundation of the river's shoreline lasted 15 days or more. Even with the heavy flows, the TRM did not fail to stabilize the shoreline, and the native vegetation was protected during early establishment. The vegetation used in conjunction with the C-TRM included Graminoids (Sedges, Bottlebrush grass, wild ryes, and switch grass, etc) and Wildflowers (columbine, butterfly weed, asters, coreopsis, coneflowers, and goldenrod, etc). There was some concern during the vegetation selection process and if the broadleaf plants would be able to grow through the C- TRM. The concerns were quickly relieved after high germination rates and quick establishment of the shoreline occurred within three months. Now three years after the project was completed, the riverbank has been permanently restored, and the landfill contents are safely secured from exposure next to the river. The petroleum pipeline also has been concealed, reducing the chances of conveyance lines being damaged and the potential for dangerous accidents.
机译:2002年,印第安纳州印第安纳州城市被沿着白河海岸线提出的问题。河岸侵蚀暴露垃圾填埋场以及石油管道。由于城市限制的空间有限,垃圾填埋场位于河流相邻的土地上,管道位于河流的自然堤岸之后。由于他们靠近天然水路,任何海岸线侵蚀都会对水的环境质量构成威胁。欧盟央行融资仅适用于仅限短时间,印第安纳波利斯市需要一个快速而实惠的解决方案。恢复与本地植被的海岸线,其中包括各种野花是城市的关键因素。它们在永久聚丙烯纤维复合草皮加固垫中发现了一种溶液。安装始于2003年4月并持续到2003年10月。在该项目过程中,该地区受到六个高流量水事件,是4月份的第一个,劳动节的第一个9英寸的降雨。在许多风暴活动之后,河流的完全淹没了15天或更长时间。即使用沉重的流动,TRM也没有稳定海岸线,并且在早期建立期间保护本地植被。与C-TRM一起使用的植被包括禾本科(橡皮泥,蜡笔草,野Ryes和Switch Grass等)和野花(鸽子,蝴蝶杂草,asters,coreopsis,coneflowers和goldenrod等)。在植被选择过程中存在一些问题,如果阔叶植物能够通过C-TRM生长。在高萌发率和快速建立海岸线发生三个月后,迅速缓解了担忧。现在在项目完成后三年后,河岸已被永久恢复,垃圾填埋场内容可以安全地保护河流旁边的曝光。石油管道也被隐藏,减少了运输线的机会受损,危险事故的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号