首页> 外文会议>PIPELINES 2006 >GROUNDWATER TRANSFER PROGRAM NORTH HARRIS COUNTY REGIONALWATER AUTHORITY
【24h】

GROUNDWATER TRANSFER PROGRAM NORTH HARRIS COUNTY REGIONALWATER AUTHORITY

机译:北部哈里斯县地区地下水管理局的地下水转让计划

获取原文

摘要

The North Harris County Regional Water Authority (Authority) accepted wholesale customer requests to build portions of its 2010 Groundwater Reduction Plan transmission system in 2005. The transmission system will convey groundwater from districts with excess supplies (seller districts) to districts with water quality issues or immediate water supply needs, (buyer districts). The Authority established the Groundwater Transfer Program (GTP) in 2004 and designed and constructed three GTP transmission systems, I.e. the North, South and West Systems, in 2005 and early 2006. This paper discusses how the Authority successfully implemented the GTP. Flow monitoring test data was analyzed and the hourly multipliers for certain districts were combined into either composite residential or mixed land use diurnal curves. The University of Kentucky PIPE2000 computer program was used to run static and extended period simulation models of minimum and maximum GTP operating pressures. Control valve stations equalized the daily and seasonal fluctuations occurring outside the GTP transmission system, I.e., within the district’s water systems. Fire hydrant tests indicated that seller districts could meet their contract capacities.
机译:北哈里斯郡地方水务局(当局)接受了批发客户的要求,于2005年建造了其2010年“地下水削减计划”输水系统的一部分。该输水系统将地下水从供水过多的地区(卖方地区)输送到水质有问题的地区或即时供水需求,(买方地区)。管理局于2004年制定了地下水输送计划(GTP),并设计和建造了三个GTP输送系统,即分别于2005年和2006年初在北部,南部和西部系统运行。本文讨论了管理局如何成功实施GTP。分析了流量监测测试数据,并将某些地区的小时乘数合并为综合住宅或混合土地利用的日线曲线。肯塔基大学的PIPE2000计算机程序用于运行最小和最大GTP工作压力的静态和长期仿真模型。控制阀站可以使GTP传输系统外部(即该地区的供水系统内部)发生的每日和季节性波动均等。消火栓测试表明卖方地区可以满足其合同规定的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号