Lessons learned from the shut down, planning, and the preparatory activities ofdecommissioning the research reactor VVR-S Magurele, Bucharest

机译:从关闭,计划和关闭研究堆VVR-S Magurele(布加勒斯特)的停工,计划和准备活动中学到的经验教训

获取原文

摘要

The nuclear research reactor type VVR was shut down in December 1997 after forty years ofoperation. The main characteristics of this reactor are: Thermal power 2 MW, Thermal energy – 9.59 GWhd,Average flux of thermal neutrons-1013 n/cm2.s, nine horizontal channels, sixteen vertical exposure channels, threebiological channels, reactor type tank, water used as a moderator, coolant and reflector. The reactor was used inresearch and radioisotope production. The reactor has been permanently shut down since April 2002, when thedecommissioning was officially announced. Discussions regarding funding mechanisms for the conservation phase,and decommissioning (planning, preparatory activities, spent nuclear fuel management), have taken place since fiveyears ago when the final decision of permanent shut down was taken.Quality management includes procedures for recording and archiving the lessons learned. The planning ofdecommissioning started in 1990 when the reactor was still operational. After fifteen years the regulatory body hasnot yet approved the decommissioning plan for the reactor. In this paper the following aspects are discussed:decommissioning strategy from safe enclosure to immediate dismantling, specific features of the site (treatment ofradioactive waste near reactor) and state of decommissioning, use of the lessons learned in the planning ofdecommissioning for the other two small nuclear facilities situated in the same area with VVR-reactor: Sub criticalAssembly " HELEN" and Zero Power Critical Reactor RP-0, AFR ponds for spent nuclear fuel, other radiologicalfacilities for radioisotopes production facilities radiation processing and accelerators.Preparatory activities for decommissioning have included: elaboration of a plan (inter alia, justification of theselected strategy, management of the radioactive waste in accordance with the waste acceptance criteria), reactorstorage in parallel with the removal of the equipment and materials used in research activities and radioisotopeproduction. The organizational management safety, human resources, and social aspects, development of the localcommunity, public relations, are also to be dealt with as lessons learned for exchange of experience, information andknowledge in the field of decommissioning.
机译:经过40年的努力,VVR型核研究反应堆于1997年12月关闭。 手术。该反应堆的主要特征是:2兆瓦的火力,9.59吉瓦时的热能, 热中子的平均通量-1013 n / cm2.s,九个水平通道,十六个垂直暴露通道,三个 生物通道,反应堆式储罐,用作调节剂的水,冷却剂和反射器。该反应堆用于 研究和放射性同位素生产。自2002年4月起,该反应堆已永久关闭。 正式宣布退役。关于保护阶段供资机制的讨论, 从五点开始进行了退役和退役(计划,准备活动,乏核燃料管理) 几年前,做出了永久关闭的最终决定。 质量管理包括记录和存档所学课程的程序。的规划 该反应堆于1990年开始退役。十五年后,监管机构 尚未批准该反应堆的退役计划。本文讨论了以下方面: 从安全封闭到立即拆除的退役策略,该站点的特定功能(处理 反应堆附近的放射性废物)和退役状态,以及在规划中的经验教训的利用 使用VVR反应器对位于同一区域的其他两个小型核设施进行退役:次临界 组件“ HELEN”和零功率临界反应堆RP-0,AFR乏核燃料池,用于其他放射性 放射性同位素生产设备,辐射处理设备和加速器。 退役的准备活动包括:制定计划(除其他外, 选择的策略,按照废物接收标准管理放射性废物),反应堆 存放时应与用于研究活动的设备和材料以及放射性同位素的清除同时进行 生产。组织管理的安全性,人力资源和社会方面,地方的发展 社区,公共关系也应作为经验教训进行交流,以交流经验,信息和 退役领域的知识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号