Clean-up and dismantling of UP1 reprocessing plant on CEA Marcoule site: lessons learned

机译:在CEA Marcoule现场清理和拆除UP1后处理工厂:经验教训

获取原文

摘要

The operation of the UP1 plant, the first French reprocessing plant for spent fuel unloaded fromreactors, started in 1958 and was completed in 1997. Soon after a consortium gathering three state or privatecompanies (CEA, EDF and COGEMA) was set up in order to contract clean up and dismantling operations.Currently, Atomic Energy Commission (CEA) is the only contracting authority of these operations. A dedicated fundhas been created and is now available to allow the dismantling of this plant. The UP1 decommissioning program iscomposed of:? Dismantling of various plants : the reprocessing plant UP1 and ancillary facilities as uncladding lines,vitrification workshop, high level liquid radwastes tanks etc;? Retrieval and packaging of wastes generated in the early days of site operations.Up to now 840,000 operation hours were performed in order to disassemble about 4,200 tons of components and toremove more than 95 % of initial radiotoxicity of the UP1 plant.Currently the end of this project is scheduled for 2040. The CEA Industrial partner is AREVA NC, a privatecompany. Dismantling and waste treatment operations are carried out in the frame work of a joint-liability poll ofenterprises for the 2005-2010 period, 3,000,000 h of operation work and 650,000 engineering hours are planned.Based on the feedback experience of performed operations this paper will deal with :? Importance of immediate dismantling of reprocessing plants;? Radiation exposure actual dose compared to predictions;? Management of waste and importance of waste decategorization for dismantling projects;? Dismantling techniques for teleoperated operations;? Developments necessary for specific applications.
机译:UP1工厂的运营,这是法国第一家从中卸出乏燃料的后处理工厂 反应堆始于1958年,并于1997年完成。 成立了公司(CEA,EDF和COGEMA)以签定清理和拆除作业的合同。 当前,原子能委员会(CEA)是这些行动的唯一签约机构。专项基金 已创建,现在可用于拆卸该工厂。 UP1退役程序为 由...组成的: ?拆除各种工厂:后处理工厂UP1和附属设施作为覆层生产线, 玻璃化车间,高放废液罐等; ?回收和包装在现场运营初期产生的废物。 到目前为止,已执行了840,000个操作小时,以拆卸约4,200吨的组件并 去除UP1植物超过95%的初始放射毒性。 目前,该项目计划于2040年结束。CEA工业合作伙伴是私营的AREVA NC 公司。拆除和废物处理操作是在对 企业计划在2005年至2010年期间运营300万小时和65万个工程小时。 基于已执行操作的反馈经验,本文将处理: ?立即拆除后处理工厂的重要性; ?辐射暴露实际剂量与预测值相比; ?废物管理和废物分类对拆除项目的重要性; ?遥控操作的拆卸技术; ?特定应用所需的开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号