首页> 外文会议>Lessons Learned From the Decommissioning of Nuclear Facilities and the Safe Termination of Nuclear Activities >Multi-step optimization for Salaspils research reactor dismantling anddecommissioning
【24h】

Multi-step optimization for Salaspils research reactor dismantling anddecommissioning

机译:Salaspils研究堆拆除和退役的多步骤优化

获取原文

摘要

The report describes consecutive steps for optimization of the Salaspils Research Reactor(SRR) dismantling and decommissioning (D&D) plan at three levels: 1) general strategy – managed by theGovernment, 2) detailed decommissioning planning managed by operator and competent authorities, 3) D&Dplans for particular components – managed by operator and waste management companies. The mainmilestone at the strategic level is the 2004 Cabinet decision to modify the initial SRR D&D Concept takinginto account the acquired experience during the preparatory stages of D&D and changed real conditions. Themain factors affecting the D&D Concept are: a) the modified final goal of SRR D&D (from "green field" to"brown field"), b) delays in the spent nuclear fuel (SNF) removal, thus the need to upgrade SNF storageconditions, c) changes in radiological and financial conditions. The most important feature of the updatedConcept is to accomplish only partial R D&D by upgrading existing premises for new radiation objects(Multipurpose National Cyclotron Facility). The main conclusion drawn during the assessment of proposedD&D Concept – the D&D can be accomplished in the frame of initial D&D Concept, but some modificationsare needed in relation to the final aim of the SRR D&D. Detail instructions for optimizing of a whole set ofconditions have been given by the completed Environmental Impact Assessment (EIA). The EnvironmentState Bureau supervised the EIA process, and the output – the Final Report of EIA – includedrecommendations for the D&D optimization and upgrades of radiation safety. Further development of detailedtasks will be implemented during the SRR D&D licensing, the main requirements will be prescribed inlicence conditions issued by the state regulatory authority – Radiation Safety Centre. Following steps areconsidered in the SRR D&D waste management optimisation: a) elaboration of unified approach to solid andliquid D&D waste processing, b) optimization of D&D waste transportation and of disposal space and c)socio-economic factors.
机译:该报告描述了优化Salaspils Research Reactor的连续步骤 (SRR)拆卸和退役(D&D)计划分为三个级别:1)总体策略–由 政府,2)由运营商和主管部门管理的详细的退役计划,3)D&D 特定组件的计划–由运营商和废物管理公司管理。主要的 战略层面的里程碑是2004年内阁决定修改最初的SRR D&D概念, 考虑到在D&D准备阶段和不断变化的实际条件下获得的经验。这 影响D&D概念的主要因素是:a)SRR D&D最终目标的修改(从“绿色领域”到 “棕地”),b)乏核燃料(SNF)的清除延迟,因此需要升级SNF储存 c)放射和财务状况的变化。更新的最重要的功能 概念是通过升级现有的新辐射物体的房舍来仅完成部分R&D (多用途国家回旋加速器设施)。在评估拟议中得出的主要结论 D&D概念–可以在最初的D&D概念框架内完成D&D,但需要进行一些修改 与SRR D&D的最终目标有关。有关优化整套系统的详细说明 已完成的环境影响评估(EIA)给出了条件。环境 国家局对环境影响评价过程进行了监督,结果包括环境影响评价的最终报告 有关D&D优化和辐射安全升级的建议。详细的进一步发展 任务将在SRR D&D许可期间实施,主要要求将在 国家监管机构–辐射安全中心发布的许可条件。以下步骤是 在SRR D&D废物管理优化中考虑了以下因素:a)制定统一的方法来处理固体废物 液态D&D废物处理,b)优化D&D废物运输和处置空间,以及c) 社会经济因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号