Application of large nuclear facility decommissioning lessons learned to smaller projects:from rocky flats to mound

机译:大型核设施退役经验教训在较小项目中的应用:从石滩到土墩

获取原文
获取外文期刊封面目录资料

摘要

In January 2001, the U.S. Department of Energy finalized a USD$7 billion contract to completedecommissioning and cleanup of the 6,400-acre (26 Km2), 800-building former nuclear weapons manufacturingplant known as Rocky Flats. The breakthrough approach by DOE and its contractors was cited by the U.S.Government as a model for future nuclear facility decommissioning activities. In December 2002, DOE awardedUSD$314 million, performance-based contract to CH2M HILL to accelerate the safe decommissioning and closureof the much smaller nuclear facility at the former Mound Plant in Miamisburg, Ohio. The former Mound Plantconducted extensive research with radionuclides and other weapons and nuclear related R&D, and productionactivities at the nuclear facility involved manufacture and testing of detonators and explosives that were used ininitiators;tritium recovery;and power sources for the space industry.This poster describes lessons learned thatCH2M HILL, as the managing partner of the Kaiser-Hill Company responsible for decommissioning Rocky Flats(completed in December 2005), successfully applied at the much smaller accelerated decommissioning of the formerMound Plant (completed in July 2006). Specific lessons learned to be discussed include the implementation of: a"projectized approach" to project execution;a comprehensive communication plan involving the workforce andstakeholders;incentivization of the contractor and the workforce for safe decommissioning;techniques for earlyreduction of risk;techniques to reduce infrastructure costs;innovative technologies and strategies;plans to managecontract risks for both the client (DOE) and the contractor;a strong focus on safety;and comprehensive workertransition plans.
机译:2001年1月,美国能源部敲定了总值70亿美元的合同, 退役并清理6,400英亩(26 Km2),800座前核武器制造厂 植物被称为洛矶平地。美国引用了能源部及其承包商的突破性方法。 政府作为未来核设施退役活动的榜样。美国能源部于2002年12月授予 与西图集团(CH2M HILL)签订的基于绩效的价值3.14亿美元的合同,以加快安全退役和关闭 位于俄亥俄州迈阿密斯堡的前土墩厂的小型核设施。前土墩厂 对放射性核素和其他武器以及与核有关的研发和生产进行了广泛的研究 核设施的活动涉及雷管和炸药的生产和测试,这些雷管和炸药用于 引发剂; tri的回收;以及航天工业的动力。 CH2M HILL,作为Kaiser-Hill Company的管理合伙人,负责Rocky Flats的退役 (已于2005年12月完成)成功应用于前者的小得多的加速退役 土墩厂(2006年7月竣工)。将要讨论的特定经验教训包括以下方面的实施: 项目执行的“计划方法”;涉及员工和员工的全面沟通计划 利益相关者;激励承包商和劳动力安全退役;早期技术 降低风险;降低基础设施成本的技术;创新技术和策略;管理计划 对客户(DOE)和承包商的合同风险;对安全的高度重视;以及全面的工人 过渡计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号