首页> 外文会议>Power-Gen international conference >Review of Full-Scale Mercury Control Projects at Coal-Fired Power Plants
【24h】

Review of Full-Scale Mercury Control Projects at Coal-Fired Power Plants

机译:燃煤电厂全面汞控制项目的审查

获取原文

摘要

This paper presents an overview review of on-going, full-scale mercury control projects at coalfiredpower plants. The paper describes regulatory drivers that have influenced the decision toinstall full-scale commercial mercury control systems. For selected commercial mercury controlnew and retrofit projects, the paper provides summary background information. In addition, thepaper reviews various criteria, test methods, and averaging periods employed to measure theperformance of full-scale mercury control projects. The paper also addresses co-removal ofmercury in different types of air quality control systems.
机译:本文概述了正在进行中的燃煤电厂的全面汞控制项目 发电厂。本文介绍了影响决策的监管驱动因素 安装全面的商业汞控制系统。用于选定的商业汞控制 新的和改造的项目,本文提供了摘要背景信息。除此之外 论文回顾了各种标准,测试方法和平均周期来衡量数据的准确性。 全面的汞控制项目的绩效。该文件还涉及共同删除 汞在不同类型的空气质量控制系统中的作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号