首页> 外文会议>World environmental and water resources congress >Projected Performance of the New Rainfall-Based Water DeliveryPlan for the Everglades Shark Slough
【24h】

Projected Performance of the New Rainfall-Based Water DeliveryPlan for the Everglades Shark Slough

机译:大沼泽地鲨鱼泥沼基于降雨的新输水计划的预计性能

获取原文

摘要

As part of federal and state of Florida efforts to provide more natural waterflows to the Everglades, a new Rainfall-Based Water Management Plan wasdeveloped for the Everglades' Shark Slough. This new operating plan, along withseveral new water control structures, was designed to improve the spatial andtemporal distribution of water deliveries and hydrologic conditions in Shark Slough,the main waterway of Everglades National Park. The new plan is scheduled toreplace the current plan which has been in effect since 1985. A key component of thenew plan is a new Rainfall-Driven Formula which estimates the flow targets inresponse to recent and real-time weather conditions.This paper provides an overview of the new Rainfall-Based Water Management Planwith more detailed discussions of analyses that compares the expected performance ofthe new plan with the current plan. Simulations using the South Florida WaterManagement Model (SFWMM) provided estimates of the improvement in Evergladesflows and hydropatterns. The new rainfall plan is to be implemented through the U.S.Army Corps of Engineers Combined Structural and Operational Plan (CSOP) for theModified Water Deliveries to Everglades National Park Project (MWD) and the C-111 Canal Project. Implementation is currently scheduled for the year 2010. The newrainfall plan is a practical and meaningful interim step toward hydrologic andecosystem restoration that is proposed by the Comprehensive Everglades RestorationPlan (CERP).
机译:作为联邦和佛罗里达州努力提供更多天然水的一部分 流入大沼泽地,新的基于雨水的水管理计划 为大沼泽地的鲨鱼泥沼开发。这项新的运营计划,以及 设计了几个新的水控制结构,以改善空间和 鲨鱼泥ough的水输送和水文条件的时间分布, 大沼泽国家公园的主要水道。新计划定于 取代自1985年以来生效的当前计划。 新计划是一个新的降雨驱动公式,该公式估算了 对近期和实时天气状况的响应。 本文概述了新的基于降雨的水管理计划 并进行了更详细的分析讨论,比较了预期的效果 新计划与当前计划。使用南佛罗里达州水进行模拟 管理模型(SFWMM)提供了大沼泽地地区改善的估计 流和水力模式。新的降雨计划将在美国实施。 陆军工程兵联合结构和作战计划(CSOP) 修改后的向大沼泽国家公园项目(MWD)和C- 111运河项目。目前计划于2010年实施。 降雨计划是朝水文和水文科学方向迈出的切实可行的过渡性步骤 大沼泽地综合治理提出的生态系统恢复 计划(CERP)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号