首页> 外文会议>World environmental and water resources congress >Enhanced Biological Degradation Groundwater Remediation Project60 Minute Cleaners – College Parkway, Fort Myers, Lee County, Florida
【24h】

Enhanced Biological Degradation Groundwater Remediation Project60 Minute Cleaners – College Parkway, Fort Myers, Lee County, Florida

机译:加强生物降解地下水修复项目60分钟清洁剂–佛罗里达州利县迈尔斯堡的大学百汇

获取原文

摘要

A soil and groundwater remediation system was designed and installed at the 60Minute Cleaners in Ft. Myers Florida under the State of Florida Drycleaning SolventCleanup Program (DSCP) in March 2003. A contamination assessment wascompleted at the facility which showed chlorinated solvents concentrations,associated with drycleaning operations, exceeding soil and groundwater cleanuptarget levels beneath the facility with a groundwater plume migrating approximately200 feet downgradient of the facility.A remedial system was designed and implemented which included a soil vaporextraction (SVE) system to address affected soil. To address affected groundwater,nested groundwater extraction wells were installed downgradient of the drycleaningfacility and multiple injection wells installed upgradient of the facility. The primaryobjectives for installation and operation of the remediation system were:1. Enhance the rate of dechlorination of dissolved chlorinated ethenes withindigenous microorganisms in the presumed source area (beneath the former
机译:60年代设计并安装了土壤和地下水修复系统 英尺的清洁工。佛罗里达州干洗溶剂下的迈尔斯佛罗里达 2003年3月的清洁计划(DSCP)。 在显示氯化溶剂浓度的设施中完成, 与干洗操作有关,超出了土壤和地下水的净化范围 设施下方的目标水位,大约有地下水羽流 设施下降200英尺。 设计并实施了包括土壤蒸气在内的补救系统 提取(SVE)系统处理受影响的土壤。为了解决受影响的地下水, 嵌套的地下水抽取井安装了干洗的降级 设施和安装了该设施的升级的多个注入井。首要的 修复系统的安装和操作目标是: 1.提高溶解的氯化乙烯的脱氯速率 推测来源地区(在前者之下)的本地微生物

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号