首页> 外文会议>Annual Allerton Conference on Communication, Control, and Computing vol.2 >Achieving 2/3 Throughput Approximation with Sequential Maximal Scheduling under Primary Interference Constraints
【24h】

Achieving 2/3 Throughput Approximation with Sequential Maximal Scheduling under Primary Interference Constraints

机译:在主要干扰约束下使用顺序最大调度实现2/3吞吐量近似

获取原文

摘要

In this paper, we present a scheduling policy, sequential maximal tree scheduling that attains | of the maximum throughput region in tree-graphs under primary interference constraints. The computation time of the policy varies as the square of the logarithm of the network size. Our results are a significant improvement over previous results which can attain only 1/2 of the maximum throughput region, even for graphs that have a simple path topology, in similar computation time.
机译:在本文中,我们提出了一种调度策略,即:在主要干扰约束下树形图中最大吞吐量区域的大小。策略的计算时间随网络大小的对数的平方而变化。我们的结果是对先前结果的重大改进,即使在具有相似计算时间的情况下,即使对于具有简单路径拓扑的图形,该结果也只能达到最大吞吐量区域的1/2。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号